6. Inspection, maintenance and desludging
Premier Tech
26 / 64
Solido SMART
DOKK5110E 15.04.2020
Sampling and its verification according to the legal water usage permit
In addition, sampling is to be performed and the following values are to be verified
(the legal water usage permit is authoritative here):
•
Temperature
•
COD
•
NH4-N (if required)
•
pH value
•
Ninorg (if required)
•
Solids that sediment
•
BOD5 (if required)
Caution:
In SBR plants, outflow samples can be taken at any time from the sampling
container, which is installed in the discharge of the SBR chamber.
Performance
•
Use a thin sampling dipper and take a representative clearwater sample of the last clear
water drained from the integrated sampling container in the outflow immersion pipe.
The maintenance activities specified above are performed and the inspection results are
recorded in a
maintenance report
.
This
maintenance report
is submitted to you as the operator of the wastewater treatment
plant.
Include the maintenance report with the operations logbook
and submit it to the
responsible water authorities upon request.
Checking the filter
The compressor filter must be inspected regularly during maintenance, and promptly
replaced if necessary.
Note:
To check and, if necessary, replace the filter, the technology capsule must be
opened. This must be done only by qualified personnel.
In this case, you must ensure that the cover is well closed again (recommended:
torque 25 Nm). We recommend resealing it and occasionally greasing the seal
with Vaseline.
Tip: Use the “capsule key” to open the capsule