background image

Owner’s manual

 

Page 9/14

 

20220816 

Phosphorus removal unit (DpEC) 

 

Item # 339921 

 

5.

 

Maintenance 

Regulation governing wastewater disposal systems for isolated dwellings (Q-2, r.22) stipulates in the following articles that, 

 

 

3.3 Maintenance contract: 

The owner of a treatment system referred to in section 11.1, 16.1, 87.7 or 87.13 must have a binding 

contract with the system manufacturer, the manufacturer's representative or a qualified third person in which it is stipulated that 
minimum annual maintenance will be performed on the system. 

 

The owner of the system must deposit a copy of the contract with the local municipality in which the isolated dwelling or the other 
building served by the treatment system is situated. 

 

87.16. Installation, use and maintenance:

 Every tertiary treatment system with phosphorous removal, tertiary treatment system 

with disinfection and the tertiary treatment system with phosphorous removal and disinfection must be installed, used and 
maintained in accordance with the manufacturer's manuals. 

 
The regular maintenance of your phosphorus removal unit (DpEC) followed or not by a watertight sand filter will ensure that your 
warranty remains valid and that the treatment performances are reached before any effluent is discharged from the system. Premier 
Tech strongly recommends that a maintenance visit be done every 6 months, and that, for the entire lifetime of your system. The 
maintenance visit must be performed by a qualified service technician from the Premier Tech network of service partners or a qualified 
third party as referred to in section 1x.2) of the 

Regulation respecting waste water disposal systems for isolated dwellings (Q-2, r.22)

All of the access lids of your treatment system as well as the control panel, must be accessible to the maintenance technician at all 
times. We recommend that you keep all invoices and documents returned to you as proof of the regular maintenance of your system.  

5.1.

 

Primary reactor 

The pumping out of the primary reactor must be performed when the sludge contained in the first compartment of the primary reactor 
reaches a level of 70 to 75% of its overall height. Should the measured level justify this procedure, the maintenance technician will 
advise the owner. It becomes the owner’s responsibility to take the appropriate actions: failing to do so may cause your treatment 
system to fail and its performances to deteriorate.  
 
If your residence is equipped with a garbage disposal system or a disposal pump, we strongly recommend that you empty your 
primary reactor more often. The use of this type of device increases the amount of sludge in the primary reactor. 
 
We recommend that you keep proof of the pumping out of your primary reactor (invoices) along with this Owner’s Manual so as to 
keep a record of complete treatment system maintenance. 
 
IMPORTANT: there are different types of pumping out procedures and they can be divided into two categories, namely a complete 
pumping out and a selective or partial pumping out. It is mandatory to opt for a complete pumping out of the primary reactor. This can 
be easily verified as the primary reactor should be completely empty when the vacuum truck leaves. To ensure a better protection of 
your system and to receive service pumping out services that are well adapted to your needs, Premier Tech recommends that you 
contact a local Premier Tech service partner or a qualified third party as referred to in section 1x.2) of the 

Regulation respecting waste 

water disposal systems for isolated dwellings (Q-2, r.22) 

to perform the maintenance of your primary reactor.  

 

5.1.1.

 

Flow Regulator 

Under normal working conditions, such as the ones described in the present document, the Flow Regulator will operate for many 
years. It must however be cleaned and inspected at every maintenance visit and primary reactor pump out.  

 

 

Summary of Contents for REWATEC Phosphorus removal unit

Page 1: ...Owner s manual Phosphorus removal Certified to BNQ standard NQ 3680 910 2022 Certified to CAN BNQ standard 3680 600...

Page 2: ......

Page 3: ...ed with a watertight sand filter it is an NQ 3680 910 and CAN BNQ 3680 600 certified disinfection system This document contains information concerning the operating guidelines the maintenance as well...

Page 4: ...treatment systems designed by Premier Tech are a technological advancement based on phosphorus removal by electrocoagulation This technology specially developed to treat wastewater from onsite applica...

Page 5: ...odes During system operation the wastewater is mixed with aluminium particles freed from the electrodes The aluminium charged effluent from the reaction zone then transfers freely to the separation zo...

Page 6: ...inuous or intermittent use without requiring any special precautions and without any impact on the quality of the treatment The owner has no particular action to make to bring the system into operatio...

Page 7: ...coffee beans cigarette butts sanitary napkins tampons condoms cotton swab etc It is important that anyone using or maintaining the septic installation or property installer landscaper owner snow remo...

Page 8: ...e system can be postponed No request for delayed start up will be accepted any later than one 1 year after the purchase date without this affecting the product s warranties 2 4 Start Up Upon the compl...

Page 9: ...eatment system There must be a follow up with the proper verifications The TEST button allows you to check if the alarm system is working properly During a test the red indicator should light up and a...

Page 10: ...es is mandatory Use four 4 separate circuit breakers two to operate the control panel one to connect the alarm box and the last one for TLP FAS when required No other household appliance should be con...

Page 11: ...recommend that you keep all invoices and documents returned to you as proof of the regular maintenance of your system 5 1 Primary reactor The pumping out of the primary reactor must be performed when...

Page 12: ...n and phosphorous removal must at least once per 6 month period have a sample of the system s effluent analyzed to determine the concentration if any of fecal coliforms or total phosphorous The owner...

Page 13: ...time of publication Premier Tech Ltd makes no warranties or representations as to its accuracy Because of its continuous improvement policy Premier Tech Ltd and its affiliated companies reserve the ri...

Page 14: ...ech or by a qualified third party as referred to in section 1x 2 of the Regulation respecting waste water disposal systems for isolated dwellings Q 2 r 22 h Any damage or problem caused by an omission...

Page 15: ...r the Customer s Successors to cover the cost of the inspection 10 INTERPRETATION The terms and conditions of this warranty shall be interpreted according to and governed by the provisions of this war...

Page 16: ...I hereby declare that the residence serviced by a Premier Tech treatment system located at the above address changed ownership on this date If you are the PREVIOUS owner I have provided the system s O...

Reviews: