A brand of
www.pregiseu.com
16-OM205-1
6
Setting up the Coiler after transit
When the Coiler is unloaded after transit some items will need to be attached or re-sited
before connecting to the Packmaster™ pro.
Remove the bolts attaching the Control Console and Remote Start Switch (Hands-free
switch) in their transit positions.
The retaining bolts for the Remote Start Switch are located inside the switch box.
Install the Control Console and the Remote Start Switch on the front of the Coiler frame
using the bolts previously removed. Position both in the optimum positions for the Coiler
operative.
Control Console
in transit position
Remote Start
Switch in transit
position
Control Console
in operational
position
Remote Start in
operational position
Optional positions for Control
Console and remote Start Switch