© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law
Page 133
Preventative Maintenance Checklist (Facility personnel)
(To be done by the facility personnel)
To Be Done Daily:
Turn off and unplug the unit.
Visually inspect the deck and belt.
Wipe down the deck and belt with a dry cloth.
All outer surfaces of the unit are clean
Inspect the power cord.
To Be Done Weekly: All of the above plus
Elevate the unit to maximum incline and remove power.
Totally clean the environment around and under the machine.
Re-connect power and turn the unit on.
Perform the "Running Belt and Deck Cleaning Procedure"
To Be Done Monthly: All of the above plus
Remove the power from the unit.
Clean the outer surfaces of the unit, and scrub the top surface of the belt.
Summary of Contents for TRM10/GEN06
Page 2: ......
Page 23: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 21...
Page 93: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 91...
Page 140: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 138...
Page 141: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 139...
Page 142: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 140...
Page 143: ...Precor Incorporated Unauthorized Reproduction and Distribution Prohibited by Law Page 141...