prepASH Operating Instructions
Precisa
Ref01.i
11
4.4 Assembly and Connection
NOTE
All the parts must be attached without exerting undue force. Do not apply any undue force. If you
have any problems, the Precisa customer service representative will be happy to assist.
The ashing device does not come fully assembled. Carry out the steps in the sequence outlined
below:
1.
Arrange to have an electrician assemble the plug:
L
→
Phase
230
VAC
E
→
Earth
N
→
Neutral
2.
If necessary, have the alarm plug made up (e.g. connect a pilot lamp). Use pins 1 and 3.
3.
Remove the protective stoppers from the requisite connections (process gases and waste gas
nozzle) on the back of the device.
4.
Attach the compressed air, the process gases, the mains cable, the waste gas hose and, if
necessary, the alarm plug to the designated connection points (see section
3.4.2
"Rear Controls
and Connections" on page 7).
5.
Regulate the pressure of the compressed air supply using the attached maintenance unit (see
section
3.4.2
"Controls and Connections on the Back" on page 7).
DANGER
The ashing device is operated with a 230 V AC supply. The electrical wiring work should
be carried out by a qualified electrician.
Have the electrician check that existing electrical installations are in good working order
and that fuses and cable cross sections are sufficient for the connection data on the
rating plate for the ashing device.
The exhaust gas hose must be fed
into an exhaust system
in order to discharge harmful
waste gases from the furnace chamber safely.
In order to continue the assembly process, you need to start the ashing device and open the furnace
chamber.
6.
Press the master switch on the front device (see section 3.4.1 Front controls on page 6)
7.
As the weighing pan is not in place, the unit cannot start properly. Wait until the error message
appears and confirm. Now, in the service mode, the hood may be opened. (Administrator
password: 83710).
8.
Remove the balance protection plug and slide in the weighing pan support. Restart the device
(on-off main switch). The start-up screen appears.