Installation
5
Powerware
®
5125 Installation Guide for IBM Applications
:
164201356 B
Uncontrolled Copy
6.
Attach the front bezel to each unit (supplied in the UPS and
EBM shipping cartons).
UPS
Optional
EBMs
Figure 2. Rack-Mount UPS with EBMs
Installing Optional Equipment
This section describes the UPS options that should be installed before
starting up the UPS:
:
Power Management Software
:
Ground Bonding Screw
:
Remote Emergency Power-Off switch
Power Management Software
If you are installing power management software, use one of the
supplied communication cables to connect your computer to Port 1 on
the Multi-Server Module of the UPS.
Refer to the
Multi-Server Module User’s Guide
and the Powerware
Software Suite CD-ROM provided in the accessory kit for more
information.
Ground Bonding Screw
If your rack has conductors for grounding or bonding of ungrounded
metal parts, connect the ground cable (not included) to the ground
bonding screw.