![Powertronix Alcor User Manual Download Page 42](http://html.mh-extra.com/html/powertronix/alcor/alcor_user-manual_1591810042.webp)
Powertronix spa reserves the right to modify this document without notice
Page 42 of 46
R&D – USER MANUAL DT0430-E04
4.10. MANAGING THE UPS BATTERY
In addition to the battery voltage and current measurements, displayed in menu “
2. MEASUREMENTS”
, it
is also possible to test the battery efficiency without any interruption to the load.
In case of battery failure, the message
“BATTERY TEST FAILED”
will be displayed on the LCD.
In this situation call the technical assistance centre.
4.11. BATTERY TEST PROGRAMMING
The battery test can be executed at any time by selecting the menu “
3. UPS COMMANDS
” and pressing
ENTER on
“START BATTERY TEST”
command.
The test lasts about 50 seconds.
It is also possible to schedule a periodic battery test following the instructions below:
1. Select the
“4. PANEL SETUP”
menu and press ENTER
2. Select the
“BATTERY TEST SETTING”
and press ENTER.
Select, using the arrows, the day of the week to perform the test, the number of weeks between tests
(from 1 to 52, [--] means no automatic test) and the time of the day to start the test.
Press ENTER to confirm each choice.
After every successfully end of the start-up UPS is executed an automatically battery test, in case
of anomaly the system goes in alarm mode (red led light), in this case check the battery and
execute again the manual battery test as described above.