www.powershield.com.au
7
2.
Maintain an ambient temperature range of 0ºC to 40ºC for UPS optimal operation.
3.
It’s required to maintain maximum altitude of 1000m to keep UPS normal operation at full
load UPS. If it’s used in high altitude area, please reduce connected load. Altitude derating
power with connected loads for UPS normal operation is listed as below:
4.
Place UPS:
It’s equipped with fan for cooling. Therefore, place the UPS in a well-ventilated area. It’s required
to maintain minimum clearance of 100mm in the front of the UPS and 300mm in the back and
two sides of the UPS for heat dissipation and easy-maintenance.
Step 1: UPS input connection
Plug the UPS into a two-pole, three-wire, grounded receptacle only. Avoid using extension cords.
Step 2: UPS output connection
There two kinds of outputs: programmable outlets(
white coloured outlets
)and general
outlets (
black coloured outlets
).
Please connect
non-critical devices to the programmable outlets
and
critical devices to
the general outlets.
During power failure, you may extend the backup time to critical devices by setting shorter
backup time for non-critical devices.
Step 3: Communication connection
Interface ports:
USB port RS-232 port Intelligent slot
To allow for unattended UPS shutdown/start-up and status monitoring, connect the
communication cable one end to the USB/RS-232 port and the other to the communication port
of your PC. With the monitoring software installed, you can schedule UPS shutdown/start-up and
monitor UPS status through PC.