19. Nose Assy. 1
STEEL BALL 3 (Kit # 56355)
ADJUST DIAL (C5)
(Kit # 56364)
COMPRESSION SPRING (ADJUSTER) (Kit # 56355)
HEXAGON SOCKET HEAD CAP SCREW 4 x 5
(Kit # 56355, Kit # 56369)
MAGAZINE BUFFER (56184)
NOSE UNIT
CONTACT ARM
ASSY.
Completed
Set the Steel Ball 3 and Compression Spring
(Adjuster) in that order, and lock with the Hexagon
Socket Head Cap Screw 4 x 5.
HEXAGON SOCKET HEAD CAP SCREW 4 x 5 (Kit # 56355, # 56369)
COMPRESSION SPRING (ADJUSTER) (Kit # 56355)
MAGAZINE BUFFER
(56184)
STEEL BALL 3
(Kit # 56355)
−
19
−
ADJUST DIAL
(Kit # 56364)
NOSE UNIT
CONTACT ARM
ASSY.
ADJUST DIAL (C5)
(Kit # 56364)
1. Assemble the Magazine Buffer to the Nose Unit.
2. Assemble the Adjust Dial (C5) and Contact Arm Assy. to the Nose Unit.
3. Assemble the Steel Ball 3 and Compression Spring (Adjuster) to the Nose Unit in
that order, and lock with the Hexagon Socket Head Cap Screw 4 x 5.
(Tightening torque: 0.9 to 1.1 N·m)
ASSEMBLY PROCEDURE