TOOLS REQUIRED:
7/16”, 1/2”, 9/16”, and 5/8" sockets and ratchets, block(s) of wood (minimum of 6” tall).
Refer to the parts list on pages 8 and 9.
WHEEL INSTALLATION
1. Block up end of generator opposite the fuel tank cap to install wheel kit.
2. Insert wheel spacer
(item 18)
into the center of the wheel
(item 31).
3. Slide 3/8 x 4.25” bolt
(item 35)
and 3/8 washer
(item 21)
through the wheel
(item 31)
, then through the wheel bracket on the
carrier, with the offset side of the wheel hub against the wheel bracket.
4. Thread 3/8 nyloc nut
(item 17)
onto the bolt and tighten to securely clamp the wheel assembly to the carrier.
5. Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1. Assemble the rubber feet
(item 32)
to the foot bracket
(item 41)
using a 1/4-20 x 1.5” bolt
(item 40)
. Thread a 1/4 washer
(item 13)
and a 1/4 nyloc nut
(item 15)
to the bolt to secure the assembly.
Caution: Do not over tighten so that the foot
material collapses.
2. Blocking up the alternator side of the generator, place the foot bracket under the carrier channel. Thread a 5/16-18 x 1” bolt
(item 14)
with a 5/16 washer
(item 34)
through the mounting holes and thread a 5/16 washer
(item 34)
and a 5/16 nyloc nut
(item 37)
to the bolt to secure the foot bracket to the carrier.
HANDLE INSTALLATION
1. Place handle
(item 39)
over carrier tubing on same end as feet, centering handle on the carrier.
2. Slide 7/16 x 2” bolt
(item 43)
through handle as shown in diagram and secure with 7/16” nyloc nut
(item 45).
Tighten until
handle is securely clamped to the carrier tubing.
3. Apply aerosol hairspray or similar adhesive to the handle
(item 39)
, and then slide the handle grip
(item 44)
onto the handle.
The aerosol hairspray will allow for easier assembly and will adhere the grip to the handle.
3
English
PORTABILITY KIT INSTALLATION