PHG-1000X
STEP 7
BE CAREFUL TO ASSEMBLE ALL COMPONENTS
IN THE SEQUENCE THAT THEY ARE PRESENTED.
NOTE:
finger tighten all hardware in this step. DO NOT wrench tighten
until the last step. some components may be pre-assembled.
nylon lock nuts will not fully screw onto bolts, must wrench tighten.
*the directions below are for routing the cables for the
row bar, lat bar, and the right and left fly frames.
LAT BAR: use (#38) 3440mm steel cable.
P1
-attach ball end to
snap link on lat bar.
P2
-route bolt side of cable up and over
pulley attached to front opening of top frame (D).
P3
-route
cable over and down pulley attached to rear opening of top
frame (D).
P4
-route cable down and around pulley attached to
top of top pulley holder (P).
P5
-route cable up and over
pulley attached to rear of top frame (D).
P6
-remove cable bolt
(#45) from selector rod bolt (#44), slide metal ball end of
cable through selector rod bolt (#44). Attach cable end
shaft (#47) and securely tighten allen screw (#46). Pull
cable tight, so cable end shaft (#47) fits securely inside
selector rod bolt (#44). Reinstall cable bolt (#45) into
selector rod bolt (#44).
FLY FRAMES: use (#39) 3050mm steel cable.
Q1
-attach
stamped eye end to hook on back side of right fly frame (K).
Q2
-route cable around right pulley attached to fly frame (I).
Q3
-route cable over and down right pulley attached to
angled frame (C).
Q4
-route cable down and around top pulley
attached to bottom pulley holder (Q).
Q5
-route cable up and
over left pulley attached to angled frame (C).
Q6
-route cable
around left pulley attached to fly frame (I).
Q7
-attach
other stamped eye end of cable to hook on back side of left
fly frame (J).
ROW BAR: use (#40) 3790mm steel cable.
R1
-attach the ball
end to snap link on row bar.
R2
-route the chain side end
under and through the pulley attached to pulley frame
(H).
R3
-route the cable under the pulley attached to angled
frame (C).
R4
-route the cable up and over the bottom pulley
attached to bottom pulley holder (Q).
R5
-route the cable
down and around the pulley attached to mainframe (A).
R6
-route the cable back up and around the bottom pulley
attached to top pulley holder (P).
R7
-route the cable down to
mainframe (A) and attach to eye holder using snap link (#30).
30
Summary of Contents for PHG-1000X
Page 1: ...Owner s Manual PHG 1000X HOME GYM WWW BODYSOLID COM ...
Page 6: ...PHG 1000X HARDWARE LIST QUANTITY DESCRIPTION SIZE PART 6 ...
Page 7: ...PHG 1000X HARDWARE LIST CONT QUANTITY DESCRIPTION SIZE PART 7 ...
Page 17: ...PHG 1000X NOTES 17 ...
Page 19: ...PHG 1000X STEP 1 19 Above shows STEP 1 assembled and completed T PIN handle ...
Page 21: ...PHG 1000X STEP 2 21 Above shows STEP 2 assembled and completed ...
Page 23: ...PHG 1000X STEP 3 23 Above shows STEP 3 assembled and completed optional weight stack SP150 ...
Page 25: ...PHG 1000X STEP 4 25 left shows STEP 4 assembled and completed T PIN handle ...
Page 27: ...PHG 1000X STEP 5 27 left shows STEP 5 assembled and completed ...
Page 29: ...PHG 1000X STEP 6 29 left shows STEP 6 assembled and completed ...
Page 31: ...PHG 1000X STEP 7 31 P4 P1 P3 P2 P6 P5 R2 R3 R4 R5 R6 R1 R7 Q1 Q3 Q5 Q2 Q4 Q6 Q7 ...
Page 32: ...PHG 1000X EXPLODED VIEW 32 ...
Page 33: ...PHG 1000X NOTES 33 ...