![PowerGuard 10KT User Manual Download Page 26](http://html1.mh-extra.com/html/powerguard/10kt/10kt_user-manual_1589449026.webp)
-
22
-
3. Operation and maintenance
1) To perform the general operation, follow the stand-alone
operating requirement.
2) Startup: The units transfer to INV mode simultaneously as they
start up sequentially in Line mode.
3) Shutdown: the units shut down sequentially in INV mode. When
the last one completes the shutdown action, each unit will shut
down the inverter simultaneously and transfer to Bypass mode.
It is easy to operate the equipment, with no previous training. You
just need to read through this manual and operate according to the
instructions in it.
Parallel Installation Diagram
Summary of Contents for 10KT
Page 23: ...Wiring diagram of 6KT XL 0KT XL 1 parallel system...
Page 24: ...Wiring diagram of 3C 1 KT XL 0 parallel system...
Page 25: ...Wiring diagram of 3C 15KT XL 20KT XL parallel system 3C...
Page 48: ...STEP 5 The output voltage would be 230VAC after the UPS is turned on...
Page 50: ...DB 9 Interface of AS400 communication protocol...
Page 54: ...10KVA Back View of 31 Back View of 31 20KVA...
Page 55: ......