P
OWERBOND
Art.Nr. 9109
7
Start-up and Operation
To avoid risk of stumbling:
Lay all instrument connections (cables, hoses, and lines) so that they do not cause any risk of stumbling
(cable conduits, bridges)!
Make supply connections and settings
Connect the TR 55 LCD Glue Gun to the electric mains of 230 V / 110 V and a compressed air line of max. 6
bars.
-
Plug connecting cable into socket with earthing contact.
-
Adjust working temperature for hot melt.
1
2
3
1 = raise temperature 2 = lower temperature 3 = on / off / confirmation
Switch on:
Press the
key 3
to switch the glue gun on.
Raise temperature:
Press the
key 1
until the desired temperature is displayed. For confirmation press
one time
the
key 3
.
Lower temperature:
Press the
key 2
until the desired temperature is displayed. For confirmation press
one time
the
key 3
.
If the chosen temperature is not confirmed within a few seconds by pressing the key 3, the device will use
the last chosen temperature. While the device is heating up to the chosen temperature, the numbers on the
display are blinking.
Minor leaking during heat-up phase is due to hot melt expanding in the nozzle/heating chamber.
As soon as the working temperature is reached, the hot melt will not leak out anymore.
Attention: Temperature regulation not calibrated!
If an exact temperature is needed, it must be
checked with a suitable temperature sensing tool.
Checkpoint
Attention: After heating up, nozzle and cap are extremely hot!
Never work without hand gloves.
Stand incl. pressure controller and manometer
Precise adjustment of compressed air ensures an exact regulation of the glue quantity to be applied. The
adjusted pressure may be read from the manometer indication.
-
Mount compressed air hose between glue gun and stand
-
Connect compressed air hose for main connection to the rear side of the stand.
Loading of Glue
Summary of Contents for TR55 LCD
Page 12: ...POWERBOND Art Nr 9109 12...
Page 14: ...POWERBOND Art Nr 9109 14...