14
4111-0012 — Sept. 2018
© 2018 Systems, LLC
INSTALLATION
A
B
J
C
D
A— Distance (Leveler Frame
Height)
B— Shim Locations (Under
Rear Vertical Supports)
C— Shim Location (Under
Maintenance Prop)
D— Shim Locations (Under
Lip Keepers)
E— Dock Floor
F— Rear Pit Curb Angle
G— String
H— Rear Hinge Frame Angle
J— Shims Location(Under
Hoist Cylinder)
K— Distance (Dock Floor-to-
Pit Floor)
L— Distance (Top of Shim
Stack-to-Dock Floor)
M— Shim Stack
N— Dock Leveler Frame
P— Lip Keeper Shim (as
required)
Figure 9
Install Dock Leveler
P
L
F
M
H
N
G
E
K
Figure 8
Figure 7
Summary of Contents for LHP Series
Page 13: ...11 4111 0012 Sept 2018 2018 Systems LLC This page intentionally left blank INSTALLATION ...
Page 25: ...23 4111 0012 Sept 2018 2018 Systems LLC INSTALLATION This page intentionally left blank ...
Page 31: ...29 4111 0012 Sept 2018 2018 Systems LLC MAINTENANCE This page intentionally left blank ...
Page 42: ...40 4111 0012 Sept 2018 2018 Systems LLC PARTS B A D C Lip and Platform Parts ...
Page 47: ...45 4111 0012 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank ...
Page 49: ...47 4111 0012 Sept 2018 2018 Systems LLC PARTS This page intentionally left blank ...
Page 50: ...48 4111 0012 Sept 2018 2018 Systems LLC This page intentionally left blank MISCELLANEOUS ...