Installation - Page 18
2.3
Connect the Power S
1.
controls panel. Feed the cables up and over
, through the clamp
wires, brown to L and blue to N and
).
Note:
cable, ensure that the length of the earth wire
is such, that if the power supply cable pulls
wires become taut before the earth wire.
2.
ted through
the hole in the base of the rear cover, through
terminal connection.
3.
the terminal block and the cable clamp, then
Ensure sufficient slack is available to the
cable clamps to allow the control panel to
panel.
I
section 2.4
performing steps 4 and 5
below.
Secure the controls assembly to the chassis
using the screw previously removed.
Carry out preliminary electrical system checks
i.e. Earth Continuity, Short Circuit, Polarity
Frost Thermostat:
If a Frost Thermostat is to be fitted, the
external to the boiler.
The Frost Thermostat should be connected
the supply cable to the boiler.
Do not switch on the electricity supply at
Summary of Contents for Suprima 30
Page 6: ...Installation Requirements Page 6 ...
Page 10: ...Installation Requirements Page 10 Fig 3 Fig 4 ...
Page 12: ...Flue Kits Page 12 ...
Page 13: ...Optional Extras Flues Page 13 Installation instructions included as necessary with each kit ...
Page 14: ...System and Other Kits Page 14 ...
Page 15: ...System and other Kits Page 15 ...
Page 33: ...6 Wiring Diagram Page 33 ...