background image

 

 

Part 14

USING THE TOUCH TERMINAL 

APPLICATION ENVIRONMENT 

It is 

very

 important that you check the following operational 

guidelines: 

Ventilation 

This terminal must 

NOT

 be operated in an environment with 

restricted ventilation. There must be at least 25 mm air clearance around any 
top or side ventilation holes with a free flow of air around the unit at 

ALL

 

times for the installation. 

Operating Environment 

The equipment must not be operated or stored in extremes of both 

temperature and humidity/moisture. (Operating range 5°C to 40°C and up to 
80% humidity – non condensing, max. wet bulb 26

°

C) 

UPS Battery (option) 

General care: 

The UPS battery is consumables beyond product warranty. Please 

definitely observe the alerts in beginning of this manual. If the equipment is to 
be powered off for more than few days, please always 

disconnect

 the battery 

from the system. Reconnect it and turn on the system to recharge the battery 
for 1 ~ 2 hours every 3 months for temperature lower than 30

°

C. Recharge for 

1 ~ 2 hours every month for temperature over 30

°

C. Temperature above 

40°C 

must be strictly avoided

 as it could cause termination of battery life and 

unexpected result even if the battery is not in work. The UPS battery can 
support basically the data preservation and smooth running of the system 
during intermittent or few minutes  (within 30 min. depending on loading and 
battery condition) power failure. 

Battery replacement: 

In the  preloaded OS for a FT system, there is a built in utility Power 

Manager that will  interface the UPS battery  monitor status with user. When 
battery monitor disables the battery charging as designed while the UPS 
function of the system is originally enabled, in other words the UPS battery is 
found  out of order if actually installed, there will be a popup message  as the 
picture at right asking the user to agree disabling the 
UPS function. The system will operate under 
deactivated UPS function no matter agreed or not. 
However, the monitoring goes on and the popup 
message will come back on next system power up boot if not agreed. In any 
case, please replace the used up UPS battery at power off if the battery is well 

Summary of Contents for FT-6315

Page 1: ...ing from the furnishing performance or use of this material This information is provided as is and Posiflex expressly disclaims any warranties expressed implied or statutory including without limitation implied warranties of merchantability or fitness for particular purpose good title and against infringement The information in this manual contains only essential hardware concerns for general user...

Page 2: ...improper maintenance reduces the battery life dramatically Always fully recharge the battery at least once every 3 months if the battery is not connected Always disconnect the UPS battery from the system if the system is to be left OFF for more than 72 hours to prevent possible damage Only connect the UPS battery back right before you are going to re power on the system Replace the battery as soon...

Page 3: ...Part 3 INTRODUCTION PRODUCT PICTURES Front Views Side Views Detail inside front cover 6 3 7 2 2 8 10 5 4 4 5 11 12 9 1 13 17 1 13 16 15 3 2 2 16 13 13 14 1 15 17 ...

Page 4: ...t buttons 12 CF reader status indicator Detail inside back cover Please note that the picture for inside front and back cover is for reference only The actual layout may disagree from this picture if there is any difference in model or options selected or in the system revision Please follow the actual layout for cable connections in this case 1 2 13 3 18 24 29 26 21 20 32 23 31 22 27 19 39 40 41 ...

Page 5: ...port 31 Audio line out port 32 LPT port 33 Semi cut PCI plate window 34 PS 2 mouse port 35 PCI bracket 36 PCI bracket fixing screw 37 HDD bracket 38 HDD hold spring 39 HDD bracket handle 40 UPS battery hold spring 41 UPS battery compartment PRODUCT FEATURES Standard Features a CPU Celeron M 1 5 GHz b Fan free structure with Aluminum die cast main unit base casing for harsh environment or metal c D...

Page 6: ...lot 9 one DIN 4 pin lock type DC 12 V power input connector 10 one UPS battery connector 11 one cash drawer connector for control over max 2 cash drawers 12 one microphone input port 13 one audio line out port 14 one CF memory card reader slot on front side of base l Touch control functions left right button double click drag draw m Dual display support per OS capability n VGA memory size shared f...

Page 7: ... c SATA control card with 2 5 SATA HDD installation d Conversion cable for the additional COM5 port to connect DB9 RS232 device Please note that only the correct conversion cable must be used e 2 in 1 cash drawer control cable f Integrated side mount upgrade kit FA 200 MSR or other later developed side mount upgrade kit g Integrated base mount device PD2603 VFD pole display PD308 LCD pole display ...

Page 8: ...NS When the FT 6315 system is ordered with options like expanded system memory or side mount upgrade kit the option s is are already installed in the system delivered Therefore no more installation is required HALF LENGTH PCI EXTENSION CARD Adding a half length PCI extension card is possible However the whole operation will involve cautiously accessing the interior of the system replacing the slot...

Page 9: ... most of the common cash drawers available on the market However it is most recommended that the Posiflex CR 2000 or CR 2200 or CR 3100 or CR 3200 or CR 4000 or CR 4100 or CR 4210 or CR 6200 be used for best compliance The FT 6315 system will directly control the cash drawer using the cash drawer port CR both to operate the opening mechanism and to monitor the drawer open status Both functions may...

Page 10: ...fic setting 1 First open the back cover of FT system base by pushing in the circled buttons on both sides as in the right pictures and lift from bottom edge to remove the back cover 2 Remove the pole cover on rear edge of the base top cover of FT system by first removing the 2 arrowed screws in the left picture and then pushing the wedge shaped pole cover up 3 Insert the base of base mount upgrade...

Page 11: ...RFACE CABLES Please connect all required interface cables to the appropriate connectors Please make sure that each connector is connected to the correct port with the correct orientation Damages due to incorrect connection or orientation are not covered by product warranty Some connectors like the LAN or CR connector or the optional conversion cable for additional COM5 port have to be gently inser...

Page 12: ...te of the fact that it is used in the way like an ordinary HDD usual utilities such as FDISK EXE or FORMAT COM shall never be used on CF Card otherwise the boot sector of operating system itself may be damaged and causing the CF Card no longer bootable For FT systems preloaded with Windows XP Pro or WEPOS on HDD Posiflex provides recovery CD delivered with the touch terminal for the preloaded oper...

Page 13: ...Part 13 a system without preloaded OS is highly discouraged Posiflex shall not be responsible for any technical support to questions arisen due to non preloaded OS ...

Page 14: ...r than 30 C Recharge for 1 2 hours every month for temperature over 30 C Temperature above 40 C must be strictly avoided as it could cause termination of battery life and unexpected result even if the battery is not in work The UPS battery can support basically the data preservation and smooth running of the system during intermittent or few minutes within 30 min depending on loading and battery c...

Page 15: ...operation The power cable the power outlet and any power fusing arrangements must conform to local safety regulations Please never do any connection disconnection when system is still powered on Please always keep the system in a free air circulation POWER ON OFF Power Indicator The power indicator is the backlight LED module under the logo that serves for several purposes The relationship between...

Page 16: ...e system just remains on and unaffected When using this feature please make sure that the software application has the ability to power off the machine In preloaded Windows Posiflex Power Switch Manager in Posiflex Tools in the Program Files helps managing these functions There must always be at least 10 seconds waiting before switching on again once the system is powered off successfully Software...

Page 17: ...r dimmer by a minute amount A holding touch makes continuous change till release Main LCD Display For best viewing result please set your display resolution at 1024 x 768 with high color for FT 6315 In configuration of system memory max 32 MB can be shared as the video memory VGA Port The VGA port in the FT system supports Posiflex LCD monitor or touch monitor for 2nd display This port supports ei...

Page 18: ...e LAN status indication is also observable on the LAN connector in back cover area SERIAL PORTS COM1 2 3 4 5 In FT system there are 4 standard RS232 serial ports and 1 additional COM5 port in form of a 10 pin RJ45 type modular connector available Please use only the optional conversion cable for COM5 P N 21863233801 color black to connect a standard RS232 device All serial ports can supply a 5 V D...

Page 19: ... into the controller for IR touch Posiflex USB Touch Manager A program named Posiflex USB Touch Manager and a right click sticky button tool in the program group Posiflex USB Touch Tools is installed in the preloaded Windows system with a USB interface touch panel controller This program can also be obtained by download from the POSIFLEX web site RS232 Touch Controller If the FT system purchased i...

Page 20: ...ly any touch control function for this secondary display due to driver conflict concerns The operation range of a PS 2 mouse is also limited within the primary display area A program named Posiflex Touch Terminal Manager is installed in the preloaded Windows system for the user to maneuver versatile features of the touch terminal with a PS 2 interface touch panel controller This program can also b...