14
WARNING:
DONOTattempttoloosenorremovethe1
st
StageRegulator low pressure
hosefittingorsafetyburstplugunderanycircums
tances.Doingsocouldresultinadangerousmalfu
nction
ofthePEEBDwhichcouldresultinseriousinjuryo
rdeath
CAUTION:
Ifmoistureisfoundtobepresentinsidethe Filling
Portopening,indicatingthatwatermayhaveente
redthe PEEBD1
st
StageRegulator
andcylinder,DONOTfillorattempttouse
thePEEBDuntilithasreceivedcompleteinspecti
onandany requiredservicebyan OEM
Approvedfacility
CAUTION:
Thedial gaugeindicatoron the
PEEBD isforreferenceonly.Use the
fillsystemgaugeasindicatoroffillpressure.
WARNING:
DONOTattempttofillthePEEBD9393ifthecylinde
r markingsindicatethatitisassembledwithanon-
standardcylinderratedforadifferentfillpressureth
an4,500 psi/310
Bar.Doingsomayresultinruptureorexplosioninthe
eventoffireoroverfilling.Instead,immediatelyretu
rntheunittoan OEM Approved facilityanddonot
useunderanycircumstances.
Filling the PEEBD1206from a DiveCylinder
NOTE
: ThePEEBD1206systemdoesnotincludeaDive Tankfill adapter.Theadapter(Part No
PEEBD00600)maybepurchased separately(refertoComponentIdentification,p.10).
1.
Turn the valve Control Knob on the 1
st
Stage Regulator, clock-wise until it is
completely closed. To ensure the valve is closed, check to ensure the red indicator ring
is visible at the base of the Control Knob.
2.
Depress the 2
nd
Stage Regulator purge button to ensure the hose and regulator
arecompletely depressurized.
Summary of Contents for PEEDB1206
Page 2: ...1 PEEBD9393 PEEBD1206...
Page 18: ...17...
Page 35: ...34 1st Stage Regulator Diagram...