![POSDION REXTAR X Operation & Service Manual Download Page 51](http://html1.mh-extra.com/html/posdion/rextar-x/rextar-x_operation-and-service-manual_1582103051.webp)
POSDION Co., Ltd.
REXTAR-X Manual
PN# 100304-00
Rev.02
Page
:
39
2. Regular Maintenance
1) Introduction
The
REXTAR
-
X
X-ray unit is designed for a service life of 7 years. The performance of the
batteries however may decline during the lifetime, depending on the number and time of the
charging cycles. The batteries are replacement parts and if necessary they can be replaced by
qualified service personnel.
The device must be inspected regularly according to the following inspection schedule.
2) Inspection Schedule
a. 6-month Regular Inspection
◈
Check to see that all displays ( state display light, clock, etc. ) are functioning normally.
◈
Check to see that all functions ( all switches etc. ) are normal.
◈
Confirm the adjustment state ( 4. of the Service Manual, error codes ) of the device.
◈
Carry out any additional tests as determined by law.
b. Annual Inspection
◈
Inspect the exterior for visible signs of damage.
◈
Check the connection state of all externally-connected electrical cables.
( sensor connective cables, power cables, etc. )
◈
Open the cover of the device and check for any visible disorders.
( grounding wires come loose or even slipped off entirely, leaking, damaged wires, etc. )
※
WARNING
※
Always keep in mind that this device contains potentially
harmful elements, and must be handled by a skilled technician.
※
WARNING
※
As a safety precaution always remove the batteries before
conducting the inspection
Summary of Contents for REXTAR X
Page 2: ...This page intentionally left blank...
Page 4: ......
Page 6: ...This page intentionally left blank...
Page 52: ...POSDION Co Ltd Page 40 Rev 02 PN 100304 00 REXTAR X Manual 3 Block diagram...
Page 63: ...POSDION Co Ltd REXTAR X Manual PN 100304 00 Rev 02 Page 51 This page intentionally left blank...