![PORTMAN TLU100N Operation And Installation Manual Download Page 7](http://html.mh-extra.com/html/portman/tlu100n/tlu100n_operation-and-installation-manual_1581715007.webp)
In Commercial Confidence
6
IX.
PC SETUP AND SYSTEM INITIATION
1.
Brief PC SETUP Description
The UNIT must be initialized by PORTMAN PC setup program in order to make communication with the remote
server /call center. There are four main sections that allow users to program the device.
1)
User detail (Device ID, server IP, and port, GPRS APN
,
4 SMS number….)
2)
Geofence (9 circular Geofence and 1 Self Geofence, 20 point Geofence….)
3)
Report (Time, Distance, Intelligent mode, Low battery, Course change…)
4)
Alarm/Sleep Setup (to enable or disable the event generated by the inputs, e.g.…and set the conditions for sleep
mode.)
2.
PC setup Procedure:
¾
Step 1:
Connect the standard RS232 cable to the DB9 port.
¾
Step 2:
Open the PC setup program.
¾
Step 3:
Select the correct COM port for communication.
¾
Step 4:
Click “ok” to Start the program
¾
Step 5:
Power on the device and press the reset button for at least 3 second.
Note that, if the connection fails, please check the cable connection is secured correctly. Press the reset button for a
longer time, e.g. another 5 seconds.
3.
Detail operation decryptions:
A. LOGIN dialog window
Connect TLU100N and PC with a standard DB9 serial cable, the other terminal plug into the 3-pin connector on the main
board. Select the available COM port, and then click “OK”.
Note that: it is necessary to power on and reset the PORTMAN device soon after “OK” button clicked.
PC setup program will detect the hardware for 60 seconds. If no hardware is detected, it will exit.
During the opening up screen shown as below, user can press “Esc” key to terminate the program.
B. Version No. Checking
The below interface will last until correct TLU100N Version No. is checked. (You should run this program before turn on
power of TLU100N)