4
The installation set includes::
QXW
OHJ
SLQ
IUDPH
- plastic legs,
- M10 threaded pins,
- M10 nuts,
- plastic top handles,
- handle plugs.
Screw the legs and locking nuts onto the pins, and then screw the pins inside
pro
fi
le sockets (see the illustration). Turn the bathtub, place it on the legs, set
the height, and then level it in its future place of installation
8. CLEANING THE BATHTUB
Before installation, clean the chromium-plated surfaces of the accessories and the acrylic bathtub surface to remove
preservative substances.
9. CONNECTING TO THE SEWAGE SYSTEM
Screw one end of the enclosed drain trap to the bathtub outlet and connect the other end to the sewage system
connection using an appropriate
fl
exible hose.
10. CONNECTING TO THE WATER SUPPLY
The hydro-massage bathtub can be
fi
lled normally using concealed faucets or bathtub-mount faucets with a spout. If you
cut out holes for bathtub-mount faucets using a professional hole saw in the places recommended by the manufacturer,
bathtub warranty will remain valid.
Connection for fi lling the bathtub through nozzles:
The bathtub is equipped with a pipe tee (included in piping) with a connection for
fi
lling the
bathtub through nozzles. It is a single connection with a check valve, to which mixed water
should be led using an armored
fl
exible hose.
11. CONNECTING TO THE POWER SUPPLY
The electrical system of the bathtub should be connected to power by a quali
fi
ed electrician. The warranty terms
require that a person with appropriate electrical quali
fi
cations con
fi
rms correct electrical connection of the bathtub. In
accordance with the Polish Standards (PN-EN 60335-1, PN-EN 60335-2-60) a hydro-massage bathtub is a Class I
electrical device and, as such, must be connected to power permanently. For safety reasons, the bathtub power cord
should be connected to power using only an electrical connection secured with a residual current device (RCD) with
rated cut-off current not exceeding 30 mA. The minimum section of the bathtub power cord is 3 x 1.5 mm2. The electrical
connection for permanent bathtub connection should be prepared in zone I (device located under the bathtub). The
bathtub also requires an equalizer connection.
We recommend checking the residual current device periodically in accordance with the guidelines on testing and
resetting such devices.
The electrical system should be equipped with appropriate manual cut-off mechanism. The device must ensure that
contacts are spread on each power supply pole at overvoltage category III.
12. TESTING BATHTUB LEAKPROOFNESS DURING INSTALLATION
After preliminary bathtub placement, leveling and connecting it to the water supply, power supply and sewage system,
adjust the threaded shank to set the height of the over
fl
ow/drain device head, and then
fi
ll the bathtub with hot water to
the over
fl
ow level. Inspect the surface of the bottom as well as all devices and parts of bathtub piping. If the results of
inspection are positive, activate the massage systems available in a given bathtub for 10 minutes. When the systems
are switched off completely, leave the bathtub
fi
lled for 1 hour, and then inspect it again. If the results of inspection are
positive, empty the bathtub and proceed to proper installation.
13. PROPER INSTALLATION
Once the bathtub is tested for leakproofness:
- place it in the desired location
- set the bathtub height, keeping in mind the possible height of bathtub enclosure,
- perform bathtub leveling, making sure the bottom is slightly sloped towards the outlet,
- set the gap between room walls and bathtub top (ca. 3 mm),
- set the location of bathtub top and mount plastic handles on walls,