Workbook 4
Controller SIGMATEK - Boiler control
1
MANUFACTURER:
PONAST spol. s r.o., Na Pot
ůč
kách 163, 757 01 Valašské Mezi
ř
í
č
í,
Č
ESKÁ REPUBLIKA
tel.:+420 571 688 180 , fax +420 571 688 115, e-mail: [email protected]. www. ponast@cz
Associated regulations and instructions:
-
Workbook 1 - Design - Installation - Service - Maintenance
-
Workbook 2 - Controller RKP 12157 - Boiler control
-
Workbook 3 - Controller IGNEO - Boiler control
-
Workbook 4 - Controller SIGMATEK - Boiler control
-
Workbook 5 - Technical parameters
For proper and safe operation of the product is necessary to follow:
-
manufacturers instructions
-
general principles of the operation and installation of the product
-
standards, ordinances and regulations currently in force in the place of use of the product
The manufacturer reserves the right to innovative changes of product that may not be included in this
manual
.
Boilers have been certified for operation in the Czech Republic and the EU countries by Engineering Test
Institute Brno, State testing laboratory n. 202
General information on CAA and smoke control
The Clean Air Act 1993 and Smoke Control Areas
Under the Clean Air Act local authorities may declare the whole or part of the district of the authority to be a smoke
control area. It is an offence to emit smoke from a chimney of a building, from a furnace or from any fixed boiler if
located in a designated smoke control area. It is also an offence to acquire an "unauthorised fuel" for use within a smoke
control area unless it is used in an "exempt" appliance ("exempted" from the controls which generally apply in the smoke
control area).
The Secretary of State for Environment, Food and Rural Affairs has powers under the Act to authorise smokeless fuels or
exempt appliances for use in smoke control areas in England. In Scotland and Wales this power rests with Ministers in
the devolved administrations for those countries. Separate legislation, the Clean Air (Northern Ireland) Order 1981,
applies in Northern Ireland. Therefore it is a requirement that fuels burnt or obtained for use in smoke control areas have
been "authorised" in Regulations and that appliances used to burn solid fuel in those areas (other than "authorised"
fuels) have been exempted by an Order made and signed by the Secretary of State or Minister in the devolved
administrations.
The KPxxx boilers have been recommended as suitable for use in smoke control areas when burning wood pellet.
Further information on the requirements of the Clean Air Act can be found here: http://smokecontrol.defra.gov.uk/
Your local authority is responsible for implementing the Clean Air Act 1993 including designation and supervision of
smoke control areas and you can contact them for details of Clean Air Act requirements.
Summary of Contents for Sigmatek
Page 1: ......
Page 16: ...Workbook 4 Controller SIGMATEK Boiler control 15 3 3 1 2 Menu users settings ...
Page 21: ...Workbook 4 Controller SIGMATEK Boiler control 20 Actual values Configuration ...
Page 28: ...Workbook 4 Controller SIGMATEK Boiler control 27 Load from USB Save on USB ...
Page 33: ...Workbook 4 Controller SIGMATEK Boiler control 32 ...
Page 35: ...Workbook 4 Controller SIGMATEK Boiler control 34 ...
Page 36: ...Workbook 4 Controller SIGMATEK Boiler control 35 i ...
Page 38: ...37 Picture No 7 Circuit diagram control unit ...
Page 39: ...38 Picture No 8 Circuit diagram module HZS 533 ...
Page 40: ...39 Picture No 9 Circuit diagram HZS 533 HZS 53 ...