110-392
8
Quick Start
See Installation & Startup for additional information.
1
All units:
Connect process lines
Water-cooled units:
A. Connect process lines
B. Connect facility water lines
C. Turn facility water ON
2
Fill reservoir with coolant
3
Connect electrical power to
Mains
4
Turn Power Switch / Circuit
Breaker ON
5
Turn Controller ON
6
Add coolant to reservoir as
process lines fill
7
Enter temperature set point
Summary of Contents for DuraChill 58 Series
Page 1: ...User Guide DuraChill Air and Water Cooled 1 5 HP Chillers 110 392 27 June 2016...
Page 2: ......
Page 32: ...110 392 30 Electrical Specifications...
Page 39: ...110 392 37 Appendix Flow Schematic All Models...
Page 40: ...110 392 38 Electrical Diagram 208 230V 1PH 50 60Hz Models without heater option...
Page 41: ...110 392 39 Electrical Diagram 208 230V 1PH 50 60Hz Models with heater option...
Page 42: ...110 392 40 Electrical Diagram 208 230V and 380 460V 3PH 50 60Hz Models without heater option...
Page 43: ...110 392 41 Electrical Diagram 208 230V and 380 460V 3PH 50 60Hz Models with heater option...
Page 45: ...110 392 43 DI Control Wiring H2 H3 Option Wiring H2 24 VDC H3 12 VDC...