CAUTION!
- Only original spare parts may be installed due to safety
reasons!
- Carefully dismantle the fan complying with all safety
regulations.
CAUTION!
After completing assembly of the impeller, motor and
bearings, a vibration test and operational balancing is
recommended as required before initialisation (in
accordance with "initialisation").
We recommend that you have the fans checked at regular intervals
by specialist staff or a specialist company to determine whether they
are fully functional and check in what condition they are in. Have this
inspection documented.
The type and extent of maintenance and the maintenance intervals
always depend on the way in which the fan is used. The following
table provides recommendations for these intervals and is based on
VDMA 24186-1.
Description
Interval
Test run (20 min)
Every 6 months
Test run (1 h)
Once a year
Fig. 4: Quality label
Maintenance and inspection recom-
mendations
Maintenance and repair
19.12.2012
40
Summary of Contents for CRJM
Page 1: ...Fan series CRJM CRJM01 Please read the instructions before starting any work Operating Manual ...
Page 16: ...Safety 19 12 2012 16 ...
Page 20: ...Setup und Function 19 12 2012 20 ...
Page 32: ...Installation and initialisation 19 12 2012 32 ...
Page 42: ...Maintenance and repair 19 12 2012 42 ...
Page 46: ...Faults 19 12 2012 46 ...
Page 48: ...Dismantling and disposal 19 12 2012 48 ...
Page 50: ...Appendix 19 12 2012 50 ...