– 10 –
Manual P5/EP5 23740/98.10
6. Front cover and indicator cover
The front cover of P5 is secured to the pneumatic unit with four
captured screws and sealed with an O-ring 1. The O-ring can be
looped over notches 2 in the front cover to allow for drainage.
There are eight locations on the front cover where the O-ring can be
looped. This O-ring system is common to the Pneumatic unit , I/P unit
and Feedback unit in the PMV Valve Control System P5. This unique
sealing system allows for complete sealing or draining of the units by
changing the position of the O-ring.
The indicator cover 3 is O-ring sealed and secured by a bayonet
coupling. The indicator cover is also used to secure the identification
cover 4.
To remove the indicator cover turn it slightly counterclockwise until it
loosens. Identification cover and O-ring 5 are now removable.
When installing indicator cover and identification cover make sure that
the O-ring is properly engaged.
4
3
1
5
2
1
Summary of Contents for EP5
Page 1: ... 1 Manual P5 EP5 23740 98 10 Manual P5 EP5 PMV Valve Control System alve Control System ...
Page 22: ... 22 Manual P5 EP5 23740 98 10 17 Exploded Drawing 98 9 84 ...
Page 24: ... 24 Manual P5 EP5 23740 98 10 Approvals E5 IS EU ...
Page 25: ... 25 Manual P5 EP5 23740 98 10 Approvals E5 EX EU ...
Page 26: ... 26 Manual P5 EP5 23740 98 10 Approvals E5 IS US E5 EX US 1 ...
Page 27: ... 27 Manual P5 EP5 23740 98 10 Approvals E5 IS US E5 EX US 2 ...
Page 29: ... 29 Manual P5 EP5 23740 98 10 FM ...
Page 30: ... 30 Manual P5 EP5 23740 98 10 CSA ...