
– 16 –
Manual P5/EP5 23740/98.10
Diaphragm
2 1
If P5 is equipped with I/P unit (EP5), the I/P unit must be removed to
access the diaphragm.
Loosen screws 1 and remove the diaphragm cover 2. Loosen screw 3,
diaphragm 4 and washers 5 can be removed. The diaphragm can after
have being in use look wrinkled, this is fully normal due to the tension
in it.
When installing the diaphragm make sure to place one washer on each
side of the diaphragm.
Put some Loctite 577 on the thread, install the screw 3 and tighten.
Check the O-ring for the diaphragm cover 2, install the O-ring into the
positioner housing, then install cover 2. Secure with screws 1. Torque
shall be 4,5 Nm (40 in-lbs).
3 5 4
Summary of Contents for EP5
Page 1: ... 1 Manual P5 EP5 23740 98 10 Manual P5 EP5 PMV Valve Control System alve Control System ...
Page 22: ... 22 Manual P5 EP5 23740 98 10 17 Exploded Drawing 98 9 84 ...
Page 24: ... 24 Manual P5 EP5 23740 98 10 Approvals E5 IS EU ...
Page 25: ... 25 Manual P5 EP5 23740 98 10 Approvals E5 EX EU ...
Page 26: ... 26 Manual P5 EP5 23740 98 10 Approvals E5 IS US E5 EX US 1 ...
Page 27: ... 27 Manual P5 EP5 23740 98 10 Approvals E5 IS US E5 EX US 2 ...
Page 29: ... 29 Manual P5 EP5 23740 98 10 FM ...
Page 30: ... 30 Manual P5 EP5 23740 98 10 CSA ...