GYRO-POD SPINNER
INSTALLATION INSTRUCTIONS
Rev H
1/5/2017
1974
Page 2 of 9
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note E)
2b Stone, drain rock
Concrete Footing
Footing Pin
Blocking, see
Installers Manual
Optional Filter Fabric over
Pea Gravel (for drainage)
Undisturbed Soil
(Finish Grade)
(Top of Soil)
68
3
4
"
1746mm
**
80
3
4
"
2051mm
**
(See Note D)
37
1
2
"
953mm
*
28
1
2
"
724mm
18"
457mm
Step 1
Refer to Footing Layout and mark footing hole location.
Dig (1) Ø 18" footing hole. Refer to Footing Detail for
depth and details.
* Footing depth must be adjusted to compensate for the
depth/thickness requirements of selected safety
surfacing. See Section 06.1 of the Installation Manual.
** Height shown from finish grade to top of collar.
Footing Detail