4
3.5 Casting the Wave
Important:
Please make
sure that the power cable
of 230 V is pulled through
the middle pillar so that it is
reachable from the middle
pillar arm before casting.
Once the Wave has been assembled it is ready to be placed
in the dug holes and cast. Please note that the wave legs
and middle pillar, should be cast 0,4 m below the surface.
Before casting
make sure to pull the power cable through
the middle pillar so that it is reachable from the middle
pillar arm. Please ensure that the purple PlayAlive cable is
still in place, and that one end can be reached through the
bottom hole for satellites, and the other through the middle
pillar arm.
Also please be sure that the middle pillar is completely lev-
eled.
Once this is done and the
middle pillar is leveled and the
cables are in place, the middle
pillar and the wave legs should
be cast.
3.4 Assembling Wave
Assemble the Wave by bolting the wave legs to the middle pillar. Please make sure that
the Wave’s legs are turned the correct way before bolting. The legs should be turned so
that the bolt flange is at the top. Note that the Wave’s legs have 3 holes
for satellites along their curve, please make sure that these are facing the
same way as the middle pillar arm, see illustration “overview of assembly”.
Once the Wave’s legs are turned the correct way, the Wave can be assem-
bled by bolting the bolt flange at the top of the left leg to the bolt flange
at the left side at the top of the middle pillar. Start by pushing a washer
onto the bolt, then push the bolt through the wave leg flange and then the
middle pillar flange. Then push another washer onto the bolt and lock it all
in place with the lock nut bolt. Finish by mounting the protection caps onto
the lock nut bolts’ and bolts’ heads. Repeat this process on all four corners
of the flange. see illustration “bolting process”.
Do the same with the wave’s right leg, though do remember to mirror it so
that the bolt’s head will be at the wave leg bolt flange and the lock nut bolt
at the middle pillar bolt flange.
Holes for sat-
ellites
Middle pillar
arm
Bolt
flange
Notice:
This instal-
lation step is sym-
metric. Therefore,
the procedure is the
same for both sides
of the wave.
Though do remem-
ber to mirror the
process, so that
the bolt’s head will
be by the wave leg
flange, and the lock
nut bolts by the
middle pillar flange.
Overview of assembly.
Important:
Please make
sure that the purple PlayAlive
cable is still in place and will
be both reachable and opera-
ble after casting.
Important:
Please make
sure that the middle pillar is
completely leveled, before
casting.
Middle
pillar
Notice:
For this step (3.4)
it could be an advantage to
be 2 people, or more. As
some of it will be defficult
to complete on your own.
Notice:
For this step (3.5)
it could be an advantage to
be 2 people, or more. As
some of it will be defficult
to complete on your own.
Wave leg
bolt flange
Middle pillar
bolt flange
Protection
caps
Bolt M10
x25 mm
Washer
M10
Washer
M10
Lock nuts
bolt M10
Protection
caps
Bolting process.
Summary of Contents for Wave