Technical Support: (909) 259-6001
BARRIER
9
CONCRETE BASE AND PREPARATION
Mounting Installation
11.81”
9.06”
4.53”
8.27”
17.5”
24”
Ø
2.36”
Ø
0.5”
Barrier Base
Concrete Area
24”
2”
Conduit Pipe
Come out from the center point of the concrete base.
4x.5”x3.5” anchors.
Prepare a 24”x17.5” rectangle area, and dig 17” deep into the ground. Then pour the concrete mixer
into the hole and make sure this concrete block is at least 6” above the ground (do not forget to
place the conduit pipe first before the concrete mixer).
PRODUCT DIMENSIONS