background image

18

Sun Lounge Assembly Instructions

Moisten the RD elements 

with soapy water.

Remove the plastic film 

from the PN55 panel. 

Make sure that the proper 

side faces out. Slide the 

panel between the RD1 

glazing elements. 

Note: 

If your model 

includes polycarbonate 

panels with UV protection, 

there is a single plastic film 

indicating the outside.  

Acrylic panels are protected 

by plastic film on both sides. 

Remove the plastic before 

installation.

Important: 

In order to 

maintain the life of your 

greenhouse, it is essential 

to insert glazing elements 

fully and completely, using 

soapy water, as explained 

on page 2.

Lock the left side of the 

PN55 panel into place 

with an RC8 glazing 

element. Place one end in 

the channel and push it 

down along the length of 

the profile. Make sure that 

the end of the RC glazing 

element is in line with the 

bottom of the RD element.

Continue with the middle 

PN54 panels and the back 

PN55 panel as described 

previously.

Lock all panels into place 

with RC8 elements.

Summary of Contents for Rion Sun Lounge

Page 1: ...greenhouses garden sheds outdoor garden elements and accessories Designed and manufactured by Rion A Member of the Plasson Group Rion Ltd Cabri 25120 Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email...

Page 2: ...0999 sales oldfields com au http www oldfields com au treco index htm Germany CLEMENS HOBBYTEC GmbH Rudolf Diesel Str 8 D 54516 Wittlich Germany 49 0 6571 929 222 Fax 49 0 6571 929 198 info clemens h...

Page 3: ...cessary Close all roof vents in high winds It is important to clear your Greenhouse of snow in the winter If you live in a hot climate where outside temperatures exceed 46 C 115 F in the sun or 36 C 9...

Page 4: ...ement into the profile until it snaps into place Push the glazing element along its length Continue until the end of the glazing element snaps in place The callout shows an enlarged cross section of t...

Page 5: ...and tools are included Wood Deck Your Sun Lounge can be secured to a wood deck with screws not supplied through the frame connectors Use screws that are 6 mm B in diameter and no less than 70 mm 2C l...

Page 6: ...sing The part code is stamped on each connector Profiles are listed in order by size largest to smallest Panels are identified with stickers Exact dimensions can be found in the packing list Part Code...

Page 7: ...3 E1 5 3 1 Oval Profile 113 cm 3 8A E16 1 1 1 Oval Profile 135 cm 4 5L E2 7 8 2 Oval Profile 54 cm 1 9B E15 1 1 1 Oval Profile 80 1 cm 2 7L E13 4 2 0 Oval Profile 60 6 cm 1 11G SR1 1 0 0 Inner Round...

Page 8: ...Left WIN41 0 1 0 Roof Vent WINH31 0 1 0 Roof Vent Handle GF 28 31 3 Flexible Glazing Seal m DSN 1 0 0 Door Sealer packages RB8 2 2 1 Roof Glazing 129 cm 4 2N RB7 2 2 1 Roof Glazing 79 cm 2 7D RC8 2 2...

Page 9: ...oor lead Note Arrange all 2D connectors with the stamped word OUT facing the outside of the greenhouse Place the other parts of the frame in place and lock it together with pins For Sun Lounge with Ri...

Page 10: ...oncrete Foundation Insert screws into the frame connector holes and secure them to the wood deck or modular base until they are firm but not tight Tighten each screw Note All necessary hardware is inc...

Page 11: ...t Attach a R10 and two E2 profiles to a 4A pediment rib connector and put them loosely in place Remove the plastic film from the PN51R side panel Make sure that the proper side faces out and put the p...

Page 12: ...nt Attach a R10 and two E2 profiles to a 3A pediment rib connector and put them loosely in place Remove the plastic film from the PN51L side panel Make sure that the proper side faces out and put the...

Page 13: ...ave purchased Attach a B2 profile and two E2 oval profiles to the left pediment Note The illustration is of a Sun Lounge with the entrance in the left pediment The assembly steps are identical Lock th...

Page 14: ...n along the length of the profile Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained on page 2 Mo...

Page 15: ...ns Note You will need the help of another person to lift the roof and put it in place Make sure that the roof is in the same orientation as the frame Lift the roof from both edges and walk through the...

Page 16: ...he side channels of the columns Slide the top of the panel into the channel in the bottom of the roof Continue with the other PN1 panels Lower the panel towards the frame Continue with this procedure...

Page 17: ...ncrete anchor set or expansion anchor not supplied Secure the frame to the wall using the BC frame clamp Continue attaching clamps where shown below Make sure that the center of the Sun Lounge roof do...

Page 18: ...e of the panel into place with an RC9 glazing element Place one end in the channel and push it down along the length of the profile Make sure that the end of the RC glazing element is in line with the...

Page 19: ...sides Remove the plastic before installation Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained...

Page 20: ...sides Remove the plastic before installation Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained o...

Page 21: ...gth Align it with the channel of the column profile Push it in to seal the PN1 panel Use the GT1 pin glazing tool if needed Repeat for the other PN1 panels and the panels in the front pediment Note We...

Page 22: ...a PN53 panel Slide the PN53 panel into the upper portion of the door Attach the Door12 Slider to complete the door Lock the parts of the door in place with pins Take the roll of GF sealer and pull ou...

Page 23: ...llow it to slide easily Place the assembled door into the lower sliding track Push the door forward until it clicks under the upper sliding track Attach the LI1080 doorstop with the concave portion fa...

Page 24: ...a PN53 panel Slide the PN53 panel into the upper portion of the door Attach the Door12 Slider to complete the door Lock the parts of the door in place with pins Take the roll of GF sealer and pull ou...

Page 25: ...llow it to slide easily Place the assembled door into the lower sliding track Push the door forward until it clicks under the upper sliding track Attach the LI1080 doorstop with the concave portion fa...

Page 26: ...n Lounge for sharp edges and trim with a razor knife if necessary It is important to clear your Sun Lounge of snow in the winter If you live in a hot climate where outside temperatures exceed 46 C 115...

Page 27: ...25 Notes...

Page 28: ...31 December 2009 Rion Ltd Cabri 25120 Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email rion rion com homepage http www rion com...

Reviews: