ver.11112020-00 Page 4
1. RUN CABLES
1.1
Run the return cable through the rail
for the designated circuit as per wiring
specifications.
1.2
Pull return cable through last hole
(furthest from the cable entry point – this
is the end of the circuit).
1.3
Run the first feed cable to the first hole
(from cable entry point end / driver end)
1.4
Run an extension lead from each hole
to the adjacent hole as pictured.
NOTE!
After running cable, each hole
should have one male and one female
plug ready for the next step.
BE CAREFUL THAT THE CABLE INSULATION IS NOT
DAMAGED ON SHARP INTERNAL BURRS
Last hole
(end of circuit)
Cable entry point
Return cable
Feed cable
Extension
lead
Plug points
(male and female)
INSTALLATION
INSTALLATION GUIDE
LED PUCK RGBW WIRING GUIDE
DO NOT UNDERTAKE INSTALLATION WITH DRIVER
POWERED.