18
Installation
2
Installation
Caution
Ensure the equipment is positioned so that the mains lead can be easily
disconnected.
Ensure cables do not cause a trip hazard.
Take care when lifting. Uneven load: 17 kg.
Important
Keep away from hot or cold temperature sources such heaters or air-conditioning
units.
Keep away from sources of electromagnetic interference such as large transformers.
Maintain clear space around the incubator: 150 mm at the rear and at least 25 mm
at the front and sides.
Note
The location of the connectors is shown in the
Rear view
section.
1. Carefully unpack the equipment.
2. Install on a flat, level and stable surface.
3. Connect the gas supply; see
Connecting the gas supply
.
4. If the local area network is to be used to collect data, connect now; see
External
data collection
.
5. If an external alarm is to be used, connect now; see
Connecting the external
alarm
.
6. Clean and disinfect before use; see
Cleaning and disinfecting the chamber
.
7. Install the humidifier; see
Installing the humidifier
.
8. Connect the mains supply; see
Connecting to the mains supply
.
9. Press the
Run
button to leave standby mode and enter the normal run mode.
10. Ensure both status indicators turn green within 30 minutes.
11. Check bubbles can be seen flowing through the bottle; see
Checking the liquid level
indicator
.
12. From the main display, click
Menu
.
13. Select
Standby
. This will switch off the gas supply and stop heating the chambers.
13
19
19
20
35
25
20
36
Summary of Contents for BT37-02
Page 1: ...INSTRUCTIONS FOR USE BT37 v2 MA200214 M EN 2 0 24...
Page 2: ......
Page 5: ...Introduction...
Page 17: ...Installation...
Page 21: ...Operation...
Page 32: ......
Page 33: ...Routine maintenance and troubleshooting...
Page 46: ......
Page 47: ...Additional information...
Page 55: ...55 Index view side 12 W warnings 8 warranty 6...
Page 56: ......