Installation of Thermostat, Sensor Tee and Check Valve 

 

Sensor Tee 

 

Ensure that the Sensor Tee is fitted on the flow line between the appliance and the 
header tank. 

 

This is to be fitted as close to appliance to allow an accurate gauge of the water 

temperature. 

Follow wiring diagram. 

 

This should be fitted with “Hemp & Paste” 

 
Thermostat 

 - Refer to wiring diagram 

 

The thermostat is to be connected to the pump – the pump activated to turn on when 
the set temperature is reached. 

 

Ensure that pump is fitted with 2 sensor tee’s and 2 thermostat’s: One thermostat to 
trigger the pump to turn ON at 15

°

C. The other thermostat to turn the pump OFF at 

55

°

C allowing a consistent circulation between the appliance and the BCU. 

 

BCU is to be fitted with a thermostat that is activated to come on at 15

°

C. 

Follow 

wiring diagram. 

 

The secondary pump in the field, which is branched off the flow line, is ideally set to 
65

°

C to begin with – this can be increased or lowered depending on the application. 

 

The goal is to pull the water off before boil point in the header tank. 

 
 

Check Valve 

 

Check valve to be installed above pump on the flow line, minimum 200mm below 
header tank. 

This will reduce thermosiphoning, ensuring heat is pulled off the boiler and not the header 

tank. 

 
 

 

Summary of Contents for Hydronic

Page 1: ...Pivot Stove Hydronic Installation Guide...

Page 2: ...ves that will isolate or restrict the flow to be installed Minimum 1 copper to be used between the header tank and appliance Flow Line going into the header tank is to be submerged below the water lin...

Page 3: ......

Page 4: ......

Page 5: ...house 5 Overflow vent pipe to be drained off the roof externally in copper 6 Field pump thermostat to activate on at 65 degrees 7 Field pump to be 8 Field pump to be installed above BCU and electrical...

Page 6: ...oiler to be activated see page 5 Re circulation pump to be wired directly to gasogen to be activated see page 6 Buffer Tank 400ltr 7 Immersion thermostat to activate field pump on at 70 degrees 8 Seco...

Page 7: ...off on the flow line above the location of the sensor tee and BCU yet below the swing check valve Pump is to be fitted with isolation ball valve unions to allow the pump to be isolated for servicing a...

Page 8: ...thermostat s One thermostat to trigger the pump to turn ON at 15 C The other thermostat to turn the pump OFF at 55 C allowing a consistent circulation between the appliance and the BCU BCU is to be fi...

Page 9: ......

Page 10: ...the left hand side on the constant setting as indicated 3A Siemens thermostat to activate the BCU to come on at 20 degrees this is wired into terminal 3 and 1 3B Siemens thermostat to be wired to tur...

Page 11: ...de on the constant setting as indicated 3 Siemens thermostat to be wired to turn the pump of one to temperatures reach 55o This is wired to terminal 2 2 4 Sensor Tee s one to be installed below the BC...

Page 12: ...LHS and is fully open to the desired temperature Optional Thermostatic heads are to be fitted on the LHS in replacement for the cap on the valve Manifold Pipe Between the appliance and the manifold t...

Page 13: ...eld yet as close as possible to the manifold servicing the In Slab Pipe The pipe used for the In Slab circuit is recommended to be 16mm oxygen barrier pipe work No more than 100m of pipe per circuit i...

Page 14: ...CU or pump tee off This will reduce back flow 3 Domestic cold water inlet to lead coil 4 Domestic hot water lead to house 5 6 Both pumps are to be activated at the same temerature 6 Field pump thermos...

Page 15: ...er is evident then lock off and begin the next line Use a bowl or cup to catch any water that bubbles out this water may be black in colour and could stain any surface contacted As soon as air bubbles...