Hydronic Systems
Hydronic Manual
Project Number
N/A
Drawn By
Pivot Hydronics
Checked By
Pivot Hydronics
Date
24/9/16
A- 5.00
Sheet Number
5
REV
-
Pivot Stove and Heating
*NOT TO SCALE*
Notes:
Gasification System
1
. Flow to enter in side of tank.
2
. Return line to be installed
below tank
3
. Domestic cold water inlet to
lead coil.
4
. Field pump to be wired
directly into gasogen boiler to be
activated. *see page...*
5
. Re-circulation pump to be
wired directly to gasogen to be
activated. *see page... *
6
. Buffer Tank 400ltr.
7
. Immersion thermostat to
activate field pump on at 70
degrees.
8
. Secondary field pump to
service hydronics.
9
. Thermostat to call pump off
when return temperature is
reached at 45 degrees.
10
. Expansion tank & auto fill
system kit to be installed on
return line.
11
. Manifold arrangement.
Header Tank
Feed Point
1
Check valve
3
4
Field Pump
5
Field Pump
6
7
8
9
10
11
7
9
2
Right Angle Flow
Valve
Right Angle
Return Lock
Shield
Thermostat Wiring