background image

Radiators – Manifold & Pipe 

 

Radiators 
 

 

When installing the radiators the recommended size for noggins is 90mm or 40mm. 
This will ensure that you have suitable fixings for your brackets. 

 

Bracket locations – 

refer to manufactures design 

 

The flow line is recommended fitted on the left hand side of the radiator, at the 
lowest fixing. 

 

Fixing Kit 
 

 

When fitting off the radiator, ensure that the lock shield is fitted on the return line 
(RHS) and is fully opened (turned anticlockwise). 

 

When fitting off the radiators, ensure the right angle valve fitted on the (LHS) and is 
fully open to the desired temperature. 

 

Optional Thermostatic heads are to be fitted on the (LHS) in replacement for the cap 
on the valve. 

 
Manifold / Pipe 
 

 

Between the appliance and the manifold, this should be all installed in copper. 

 

From the manifold onwards 16mm multilayered insulated pexal pipe should be 
installed to the radiators. 

 

Ensure the flow line runs to the top ports and the return line runs the lower ports. 

 

The auto bleed should be fitted on RHS flow ports 

 

Drain point fitted to the return port on the LHS 

 

The manifold is recommended to be 

fitted horizontally 

and after the pump in the 

field. 

 

The distance from the manifold to the secondary pump in the field is recommended 
to be no more than 15mm away to avoid heat loss. 

 

 

Summary of Contents for Hydronic

Page 1: ...Pivot Stove Hydronic Installation Guide...

Page 2: ...ves that will isolate or restrict the flow to be installed Minimum 1 copper to be used between the header tank and appliance Flow Line going into the header tank is to be submerged below the water lin...

Page 3: ......

Page 4: ......

Page 5: ...house 5 Overflow vent pipe to be drained off the roof externally in copper 6 Field pump thermostat to activate on at 65 degrees 7 Field pump to be 8 Field pump to be installed above BCU and electrical...

Page 6: ...oiler to be activated see page 5 Re circulation pump to be wired directly to gasogen to be activated see page 6 Buffer Tank 400ltr 7 Immersion thermostat to activate field pump on at 70 degrees 8 Seco...

Page 7: ...off on the flow line above the location of the sensor tee and BCU yet below the swing check valve Pump is to be fitted with isolation ball valve unions to allow the pump to be isolated for servicing a...

Page 8: ...thermostat s One thermostat to trigger the pump to turn ON at 15 C The other thermostat to turn the pump OFF at 55 C allowing a consistent circulation between the appliance and the BCU BCU is to be fi...

Page 9: ......

Page 10: ...the left hand side on the constant setting as indicated 3A Siemens thermostat to activate the BCU to come on at 20 degrees this is wired into terminal 3 and 1 3B Siemens thermostat to be wired to tur...

Page 11: ...de on the constant setting as indicated 3 Siemens thermostat to be wired to turn the pump of one to temperatures reach 55o This is wired to terminal 2 2 4 Sensor Tee s one to be installed below the BC...

Page 12: ...LHS and is fully open to the desired temperature Optional Thermostatic heads are to be fitted on the LHS in replacement for the cap on the valve Manifold Pipe Between the appliance and the manifold t...

Page 13: ...eld yet as close as possible to the manifold servicing the In Slab Pipe The pipe used for the In Slab circuit is recommended to be 16mm oxygen barrier pipe work No more than 100m of pipe per circuit i...

Page 14: ...CU or pump tee off This will reduce back flow 3 Domestic cold water inlet to lead coil 4 Domestic hot water lead to house 5 6 Both pumps are to be activated at the same temerature 6 Field pump thermos...

Page 15: ...er is evident then lock off and begin the next line Use a bowl or cup to catch any water that bubbles out this water may be black in colour and could stain any surface contacted As soon as air bubbles...

Reviews: