![Piusi EX 50 Instruction Manual Download Page 32](http://html.mh-extra.com/html/piusi/ex-50/ex-50_instruction-manual_1560378032.webp)
32
M0217 EN
EN
P
EVERY DAY USE
USE PROCE-
DURE
1
If flexible pipes are used, attach the ends of the piping to the tanks.
In the absence of an appropriate slot, solidly grasp the delivery pipe
before beginning dispensing.
2
Before starting the pump make sure that the delivery valve is closed
(dispensing nozzle or line valve)
3
Turn the ON/OFF switch on
4
Open the delivery valve, solidly grasping the pipe
5
While dispensing, do not inhale the pumped product
6
IF ANY TREATED FLUID LEAKS OUT DURING DISPENSING, TAKE ALL
STEPS NECESSARY TO ENSURE THE LEAKED FLUID IS CLEANED UP
AND SAFE AS SPECIFIED ON THE PRODUCT TECHNICAL SHEET.
7
Close the delivery valve to stop dispensing
8
When dispensing is finished, turn off the pump
ATTENTION
THE WORKING OPERATIONS MUST ALWAYS BE
GUARDED BY THE OPERATOR.
The by-pass valve allows functioning with delivery
closed only for short periods (max. 3 minutes).
To avoid damaging the pump, after use, make sure
the pump is off.
In case of a power break, switch the pump off
straight away.
Should any sealants be used on the suction and
delivery circuit of the pump, make sure that these
products are not released inside the pump.
Foreign bodies in the suction and delivery circuit of
the pump could cause malfunctioning and breakage
of the pump components.
Q MAINTENANCE
Safety instruc-
tions
The PUMP IS DESIGNED AND CONSTRUCTED TO require a minimum of
maintenance.
Before carrying out any maintenance work, DISCONNECT THE PUMP from
any electrical and hydraulic power source.
During maintenance, the use of personal protective equipment (PPE) is
compulsory.
In any case always bear in mind the following basic recommendations for
a good functioning of the pump
ATTENTION
BEFORE ANY OPERATION, ENSURE TO BE OUT OF
POTENTIALLY EXPLOSIVE AREAS
FOR SAFETY REASONS IT’S NOT ALLOWED TO DIS-
ASSEMBLE THESE PARTS : (1) BOTTOM (2) MOTOR
PIPE (3) PUMP BODY
Authorised
maintenance
personnel
All maintenance must be performed by qualified personnel. Tampering
can lead to performance degradation, danger to persons and/or prop-
erty and may result in the warranty and UL/ATEX CERTIFICATION being
voided.
Measures to be
taken
Check that the labels and plates found on the dispensing system do not
deteriorate or become detached over time.
ONCE A WEEK:
- Check that the pipe connections are not loose to prevent any leaks;
- Check and keep the filter installed on the suction line clean.
ONCE A
MONTH:
- Check the pump body and keep it clean and free of any impurities;
- Check that the electrical supply cables are in good condition.