Pitco CPE14 Series High Temperature Limit Upgrade Instructions Download Page 5

High Temperature Limit Upgrade Instructions Model CPE14 

with Digital Controller

 

L80-038 Rev. 1 

Page 5 of 5 

11/6/2012 

 

A)  High Temperature Limit 

Subassembly 

B) Self 

Tapping 

Screws 

Diagram G 

 

Connector Connection 

CB1 Circuit 

Breaker 

J3 Temperature 

Probe 

J5 

High Temperature Limit 

J6 DVI 

Jumper 

P1 Controller 

P4 Other 

Connection 

 
 
 

Diagram H 

8.  Fill the cook tank with water and inspect the tank coupling 

connections to assure that they are leak free. 

 
9.  Drain the water from the tank before proceeding. 
 
10.  Attach the high temperature limit subassembly to the front entrance 

box using two 10-24 self tapping screws.  (See Diagram G) 
 

11.  Connect the DVI jumper to the connector with orange and violet/white 

wires on the 

new

 front entrance box wiring.  (See Diagram H) 

 
12. Connect the 

new

 front entrance box wiring to the components in the 

front entrance box as shown.  (See Diagram H) 

 
13.  Connect the new front entrance box wiring to the controller located 

on the bezel. 

 
14.  Reinstall the bezel and secure using the 

two screws removed during disassembly. 

 
15.  Replace the schematic label located 

inside the door with the 

new

 schematic 

label. 

 
16.  Startup the appliance per the procedure 

shown in its installation and operation 
manual.  Assure that the appliance is 
operating properly.  

 
 

Schematic 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Location 

Description 

Entrance Box, Rear 

Entrance Box, Front 

C Front 

Panel 

Component 

Description 

A1 Controller 

CB1 Circuit 

Breaker 

HL1 

High Temperature Limit 

HR1 Heating 

Element 

K1, K2 

Contactor 

LS1 DVI 

MP1 Ground 

RT1 Temperature 

Probe 

T1 Transformer 

TB1, TB2  Terminal Block 

 

Schematic Key 

Reviews: