Pitco CPE14 Series High Temperature Limit Upgrade Instructions Download Page 4

High Temperature Limit Upgrade Instructions Model CPE14 

with Digital Controller

 

L80-038 Rev. 1 

Page 4 of 5 

11/6/2012 

 

A) High Temperature Limit 

 

B) Wiring 

C) 

Bracket 

   D) 

6-32 

Screws 

Diagram E 

High Temperature Limit Subassembly 

 
1.  Attach high temperature limit wiring to the 

new

 high temperature limit. 

(See Diagram E) 

 
2.  Fold over the flaps on the high temperature 

limit to cover the wiring connections. 
(See Diagram E) 

 
3.  Attach the high temperature limit to the 

bracket using two 6-32 screws. 
(See Diagram E) 

 
 

Installation 

 
1.  Apply silicone sealant to the reducer 

bushing.  Install the bushing into the hi-limit 
coupling.  (See Diagram F) 

 
2.  Insert the high temperature Limit bulb into the tank through the hi-limit coupling.  (See Diagram F) 
 
3.  Secure the bulb to the heating element using two bulb clamps, 10-24 screws and wing nuts.  The clamp 

should be located 2 to 3 inches from the front of the tank.  (See Diagram F) 

 
4.  Insert the Teflon seal into the reducer bushing.  (See Diagram F) 
 
5.  Apply silicone sealant to the high temperature limit bulkhead fitting and install the fitting into the reducer 

bushing.  (See Diagram F) 

 
6.  Adjust how much of the capillary is inside the tank until it travels a short, smooth and kink free path inside the 

tank. Assure that the capillary does NOT come in contact with the element at any point. 

 
7.  Tighten the compression screw on the bulkhead fitting until the capillary is secure.  (See Diagram F) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
A) Reducer 

Bushing 

 

B) Hi-Limit 

Coupling 

 

C) Bulb 

 

D) Bulb 

Clamp 

 

E)  Wing Nuts & Screws 

 

F) Fluropolymer 

Seal 

 

G) Bulkhead Fitting 

 

H) Capillary 
 
J) Compression 

Screw 

 
 
 

Diagram F 

Reviews: