VSW-1
36
1
2
3
4
1
2
3
4
C
D
F
A
B
E
6. ADJUSTMENT
4
1
6
5
4
3
2
1
64
49
48
33
32
17
16
1
1
16
20
1
6
5
4
3
2
1
3
2
1
3
2
1
100
76
75
51
50
26
25
1
14
8
7
1
8
5
4
1
9
8
1
16
3
1
2
14
8
7
1
9
8
1
16
J100
Q105
JA205
IC151
C172
C125
S101
L46
C280
L153
C106
L154
CN102
JA204
D114
D115
C28
C129
C191
C224
C263
C268
C277
JA101
C279
C278
C118
C227
X101
C170
JA102
IC101
C102
L47
L159
C173
C174
C298
L163
C167
IC155
C178
C175
C177
C104
C153
C154
C176
L160
C223
C22
C100
C190
L156
C219
C169
R166
R164
VC1
L158
L150
L155
L157
R123
C256
IC152
C168
X151
C275
IC154
C265
L151
L162
C276
C267
JA209
C266
JA203
C282
IC210
C27
C109
C260
C259
L161
C269
C158
C257
C26
L35
C258
L152
IC153
C150
L37
R101
C40
C146
C39
C42
Q104
L57
C149
TP2
TP1
C41
C115
L24
L36
4
1
64
49
48
33
32
17
16
1
16
1
20
1
NP
26
100
76
50
51
25
75
1
8
14
1
7
4
5
1
8
NP
16
9
1
8
NP
27MHz
8
14
17
NP
/COMPONENT
INPUT SEL
NP
GND
16
1
8
9
DWG1589
S/COMPOSITE
JACK
4
1
adj
1. JACK Assy Adjustment
Sync Generator Clock Adjustment
Adjustment Condition
Adjustment point
Measurement point
Measuring Instrument
Adjustment Value
Adjustment Point
Procedures
Power ON (J100 pin3+5V and pin2Gnd)
VC1
TP1 (27M) and TP2 (GND)
Frequency counter
27MHz
±
10Hz
1
Connect a frequency counter between TP1 (27M) and TP2 (GND).
2
Adjust VC1 so that the frequency of TP1 becomes 27MHz
±
10Hz.
SIDE A
VC1
TP2
TP1
1
2
JACK ASSY
A
Frequency counter
JACK Assy
Adjustment screwdriver
(small)
Pull out the hole plug.
In the JACK Assy replacement, adjustment of new JACK Assy is being completed.
When uses two DVJ-X1, and a screen is confused, adjustment requires.