background image

H3C S12500X-AF Switch Series

Quick Start Guide

 
 
 

 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
New H3C Technologies Co., Ltd.  
http://www.h3c.com 
 
Document version: 6PW107-20181116

 

 

Summary of Contents for S12500X-AF Series

Page 1: ...H3C S12500X AF Switch Series Quick Start Guide New H3C Technologies Co Ltd http www h3c com Document version 6PW107 20181116...

Page 2: ...espective owners Notice The information in this document is subject to change without notice All contents in this document including statements information and recommendations are believed to be accur...

Page 3: ...witching fabric modules 22 Installing a filler panel in a switching fabric module slot 24 Removing a filler panel from a switching fabric module slot 25 Installing fan trays 26 Installing fan trays fo...

Page 4: ...used indoors To make sure the switch operates correctly and to prolong its service lifetime the installation site must meet the load bearing temperature humidity cleanness EMI grounding power supply v...

Page 5: ...the switch Switch dimensions Figure 2 S12516X AF switch dimensions 1 Fan tray handle 2 Mounting bracket 3 Cable management bracket 30 mm 1 18 in 931 mm 36 65 in 845 mm 33 27 in 90 mm 3 54 in 1 3 2 12...

Page 6: ...igure 3 S12512X AF switch dimensions 1 Fan tray handle 2 Mounting bracket 3 Cable management bracket Figure 4 S12508X AF switch dimensions 1 Fan tray handle 2 Mounting bracket 3 Cable management brack...

Page 7: ...sions with the LSXM104XFAN fan trays 1 Fan tray handle 2 Mounting bracket 3 Cable management bracket Figure 6 S12504X AF switch dimensions with the LSXM104XFANH fan trays 1 Fan tray handle 2 Mounting...

Page 8: ...mm 1 18 in for the fan tray handle at the rear of the chassis S12508X AF Height 531 mm 20 91 in 12 RU Width 440 mm 17 32 in Total depth 977 mm 38 46 in 857 mm 33 74 in for the chassis 102 mm 4 02 in f...

Page 9: ...mm 31 50 in 2 U S12508X AF 220 kg 485 02 lb LSXM1BSR 630 mm 24 80 in to 900 mm 35 43 in 1 U LSTM2KSGD0 500 mm 19 69 in to 800 mm 31 50 in 2 U S12504X AF 120 kg 264 55 lb LSVM1BSR10 630 mm 24 80 in to...

Page 10: ...7 Figure 7 Installing cage nuts for the S12516X AF switch...

Page 11: ...8 Figure 8 Installing cage nuts for the S12512X AF switch 2U 1U 4U 5U 4U 1U...

Page 12: ...9 Figure 9 Installing cage nuts for the S12508X AF switch Figure 10 Installing cage nuts for the S12504X AF switch 1U 2U 4U 2U 1U 2U...

Page 13: ...four people to move the switch by holding the chassis handles As a best practice use a mechanical lift to lift the switch 3 Place the switch on the slide rails from the front of the rack and slide the...

Page 14: ...cable to a grounding strip 1 Unpack the grounding cable The grounding cable provided with the switch is compliant with the NEBS standards The two hole grounding lug of the grounding cable is used for...

Page 15: ...ounding cable to a grounding strip S12516X AF switch 1 Use the grounding screws to attach the two hole grounding lug to the grounding point 2 Grounding sign 3 Grounding strip 4 Grounding post 5 Ring t...

Page 16: ...To prevent a filler panel from being drawn into the chassis when fan speed is high use both hands to grasp the filler panel by its two sides during filler panel installation and removal on an operatin...

Page 17: ...e MPU into the slot 3 Pull the ejector levers outward 4 Push the MPU by the middle part on the front panel 5 Pull the ejector levers inward 6 Fasten the captive screws Installing MPUs for the S12504X...

Page 18: ...ptive screws and remove the filler panel 2 Pivot up the handle 3 Push the MPU into the slot along the guide rails 4 Push the MPU until the handle breaks touch the slot edges tightly 5 Push the handle...

Page 19: ...he slot where an interface module adapter is installed If you are not to install an LPU in the slot remove the interface module adapter and install a filler panel The S12500 X LPUs with the dimensions...

Page 20: ...g other components in the chassis 3 As shown by callout 2 in Figure 17 pull the ejector levers outward when most of the LPU is inserted into the slot 4 Push the LPU until the brakes on its ejector lev...

Page 21: ...Fasten the captive screws on the LPU Installing S12500X AF LPUs CAUTION Install filler panels in the empty LPU slots The S12500X AF LPUs available for the switch have a height of 50 mm 1 97 in a widt...

Page 22: ...e slot along the guide rails Keep the LPU parallel to the slot to avoid touching other components in the chassis 3 As shown by callout 2 in Figure 18 pull the ejector levers of the LPU outward when mo...

Page 23: ...olding the LPU by the front panel with one hand and supporting its bottom with the other slide the LPU gently into the slot along the slide rails Keep the LPU parallel to the slot to avoid damaging ot...

Page 24: ...ition Figure 19 Installing an LPU with foldable ejector levers S12516X AF switch 1 Push the LPU slowly into the slot along the slide rails 2 Rotate the ejector levers towards each other until they sto...

Page 25: ...a switching fabric module avoid damaging the connectors on it Fan trays cover switching fabric module slots Before installing a fan tray install switching fabric modules or filler panels in the switch...

Page 26: ...card identifier for example LSXM1CGQ36TD1 Type H switching fabric modules have a character string of SFH in their card identifier for example LSXM1SFH16C1 Type H LPUs have a character of H in their ca...

Page 27: ...of the switching fabric module Figure 22 Installing a switching fabric module S12516X AF switch 1 Push the switching fabric module slowly into the slot 2 Rotate the ejector levers inward until the sp...

Page 28: ...Figure 23 continue to push the filler panel until the brakes on its ejector levers touch the slot edges tightly Simultaneously rotate the ejector levers inward 4 Fasten the captive screws on the ejec...

Page 29: ...sufficient for heat dissipation of the switch As a best practice install two fan trays on the switch for redundancy and noise reduction The fan tray is hot swappable Follow these guidelines when you h...

Page 30: ...lign the fan tray with the fan tray slot 2 Holding the upper fan tray handle with one hand and the lower fan tray handle with the other hand insert the fan tray into the slot Keep the fan tray as stra...

Page 31: ...ay into the chassis 3 Fasten the captive screws on the fan tray Installing power modules The power module slots are located at the two sides of the rear panel The installation procedure is the same fo...

Page 32: ...all the power module into the slot If you encounter a hard resistance while inserting the power module pull out the power module reorient it and then insert it again Figure 27 Removing a filler panel...

Page 33: ...e cable tie provided with the power module to secure the power cord to the handle of the power module 3 Plug the other end of the power cord into an AC power receptacle and turn on the circuit breaker...

Page 34: ...r distribution box do not support customization A DC input terminal block provides eight pairs of terminals Each pair provides one power line reconnection A maximum of eight DC power line reconnection...

Page 35: ...the ports install the dust plugs that come with the LPUs in the QSFP CXP CFP2 QSFP28 ports if you are not to install transceiver modules or cables in the ports Installing an SFP SFP QSFP QSFP28 modul...

Page 36: ...module CAUTION Read the following instructions before you install a CFP2 module Failure to follow these instructions might cause damage Before you install or remove a CFP2 module remove the optical f...

Page 37: ...ule Do not remove the dust plug from the CXP module until you are ready to connect an optical fiber to the module Before you install a CXP module remove the optical fiber if any from it CXP modules ar...

Page 38: ...FP QSFP QSFP28 QSFP to SFP DAC cable CAUTION When you connect a fiber cable make sure the bend radius of the cable is no less than eight times the fiber diameter The cables are hot swappable Use SFP D...

Page 39: ...etwork cables The cable management brackets are installed on the two sides of the LPU section As a best practice route network cables from the left and right sides as shown in Figure 37 Figure 37 Rout...

Page 40: ...ct port The serial ports on PCs do not support hot swapping If the switch has been powered on connect the console cable to the PC before connecting to the switch and when you disconnect the cable firs...

Page 41: ...After the switch is powered on the configuration terminal output startup information The output information varies by software versions The following shows a sample output you will see when the switch...

Page 42: ...age is starting Line aux0 is available Press ENTER to get started Press Enter at the prompt When the prompt Sysname appears you can configure the switch After the switch finishes startup verify the fo...

Reviews: