11
installation manual
CAUTION
NOTE
NOTE
All pictures in this manual are for explanatory purposes only.
They may slightly differ from the air conditioner you purchased
(dependent on model). The actual shape shall prevail.
9. WIRING
The appliance shall be installed in accordance with all
national wiring regualtions.
The air conditioner should use an independent power
supply with a properly-rated voltage.
The external power supply to the air conditioner should
have ground wiring, which is linked to the ground wiring
of the indoor and outdoor unit.
The wiring work should be done by qualified persons,
and done according to the circuit drawing.
An all-pole disconnection device, which has at least
3mm separation distance in all-pole, and a residual
current device (RCD) with a rating above 10mA, shall be
incorporated in the fixed wiring, according to the
national rules.
Be sure to locate the power wiring and the signal wiring
well to avoid cross-disturbance.
Do not turn on the power until you have checked
everything carefully after wiring.
Remark per EMC Directive 89/336/EEC
To prevent flicker impressions during the start of the
compressor (technical process), the following installation
conditions apply.
The power connection for the air conditioner has to be
done at the main power distribution source. The
distribution has to be of a low impedance; normally the
required impedance is reached at a 32A fusing point.
No other equipment should be connected with this power
line.
For detailed installation exceptions, please refer to your
power supplier, to confirm if restrictions apply for products
like washing machines, A/Cs, or electrical ovens.
1
2
3
Seal
The base pan hole
of outdoor unit
Drain joint
Seal
The base pan
of outdoor unit
Drain
joint
Fig.8-2
NOTE
Remove the electric cover of the outdoor unit.
If there is no cover on the outdoor unit, disassemble
the bolts from the maintenance board and remove the
protection board. (See Fig. 9-2)
The installation bearer of the sensing device should be rotated to
another side, and then taken off the cover of electrical box. (Take
off the electrical box cover as well, if the capacity is 18000btu/hr,
and is using the network function.)
Refer to Fig.9-1.
Connect the Cable
9.1
For power details of the air conditioner, refer to the rating
plate on the product.
For any other questions, please contact your local dealer.
4
5
All pictures in this manual are for explanatory purposes
only. They may slightly differ from the air conditioner you
purchased (dependent on model). The actual shape
shall prevail.
Installation Bearer
of Sensing Device
Fig.9-1
Fig.9-2
Cover
Screw
Summary of Contents for FAB Series
Page 19: ......