10
installation manual
Service Valve Operation Instructions
1. Opening the Service Valves
1.
2.
3.
Remove the cap and turn the valve counter-
clock-wise with the hexagonal wrench.
Turn until the shaft stops. Do not apply excessive force
to the service valve. Doing so may break the valve
body, as the valve is not of the backseat type. Always
use the special tool.
Make sure to tighten the brass cap securely.
Make sure to tighten the brass cap securely.
2. Closing the Service Valves
1.
2.
Remove the cap, and turn the valve clockwise with the
hexagonal wrench.
Securely tighten the valve until the shaft contacts the
main body seal.
Flare Nut
Hexagonal
Dust Cap
Valve Core
11.
Remove the charging hose from the service port.
12.
Using a hexagonal wrench, fully open both the
LIQUID side and GAS side service valves.
13.
Tighten valve caps on all three valves (Service
Port, Liquid Side, Gas Side) by hand.
Then , tighten it further using a torque
wrench, if needed.
OPEN VALVE STEMS GENTLY
When opening valve stems, turn the hexagonal
wrench until it seats against the stopper. Do not
try to force the valve to open further.
Fig. 6.2
Copper Pipe from Indoor Unit
Service Port
(Only the GAS Side
Valve has this port)
CAUTION
The drain pipe of the indoor unit must be heat-insulated, or it,as
well as the connections of the indoor unit, will condense dew.
Hard PVC binder must be used for the pipe connection. Make
sure there is no leakage.
With the connection part to the indoor unit, please ensure not to
apply pressure on the side of indoor unit pipes.
When the declivity of the drain pipe downwards is over 1/100,
there should not be any winding.
The total length of the drain pipe, when pulled out transversely,
shall not exceed 20m. When the pipe is overlong, a prop stand
must be installed to prevent winding.
Refer to the figures below for the installation of the pipes.
8. CONNECT THE DRAIN PIPE
Install the Drainpipe of the Indoor Unit
The outlet has a PTI screw thread.Please use sealing materials
and pipe sheath (fittings) when connecting PVC pipes.
Drainage Test
Check whether the drainpipe is unhindered.
Newly-built houses should have this test done before
paving the ceiling.
1.5m~2m
Insulating
material
Downward declivity
lower than 1/100
Bend
S shape
VP30
Downward declivity
lower than 1/100
Put as deep as possible
(about 10cm)
Fig. 8-1
Install the Drain Joint of the Outdoor Unit
Fit the seal into the drain joint, then insert the drain joint into the
base pan hole of outdoor unit, rotate 90 to securely assemble
them. Connect the drain joint with an extension drain hose
(locally purchased), in case of condensate draining off the
outdoor unit during heating mode.
(Refer to Fig. 8-2)
Summary of Contents for FAB Series
Page 19: ......