AVH-P6400CD/UC
A
B
C
D
1
2
4
1
2
4
102
The numeral enclosed by a circle in the drawing indi-
cates the order of removal.
-
How to hold the mechanism unit
1. Hold the top frame and main frame.
2. Do not hold the front of the top frame tightly
because its strength is low.
-
How to remove the top frame and main frame
1. Remove the screws (4) and screws (2) of the top
frame in the clamped state and remove the top frame.
2. After having removed the screws of the dampers (2)
on the right and the dampers, remove the main frame.
3. Remount the product connector with the frame
removed and eject a disk.
How to remove the clamper arm assy and
1. Remove a total of three right, left and rear screws
2. Remove the left spring and remove the torsion
spring hook of the right fulcrum unit.
3. Remove the E ring of the left fulcrum and r
Top Frame
Clamper Arm
Assy
Guide Arm
Assy
Main Frame
Disk
Damper
Damper
emove
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299