
19
Please note: Drill
holes from the inside
of the sheet through
the pre-drilled holes
in the channels to
ensure holes line up.
Then fix channels
from the outside of
sheet ensuring the
channels are on the
inside of the sheet.
Repeat the same steps for the other side.
NOTE:
All screws marked with a cross should not be fixed at this stage. Make sure the
small lip on the channel is always facing out. This ensures rain water cannot build up inside your shed.
X 2PCS
The middle channel will have pre-punched holes although you will need to drill the holes for the top and bottom channels using a drill
with a 3mm bit.
Summary of Contents for Cyclonic Kit 3.0m Gable Series
Page 45: ...45...