background image

2018PC-03/03

15

2.0 TECHNICAL CHARACTERISTICSAND SPECIFICATIONS

Features

Cladding: .......................... Printed steel with majolica insert

Interior:............................. steel

Baffle plate and hearth:..... cast iron

Grate: ............................... cast iron

Door: ................................ Printed steel with double ceramic glass heat resistant up to 1382°F / (750°C)

Handle: ............................. in printed steel

Control panel: ................... LCD color touch screen with remote control

Timer thermostat:.............standard with daily, weekly and weekend programming modes divided into four time period

Power setting:...................from 1 to 4

Ash Clean: ...................... Automatic ash cleaning

Ash drawer: ...................... removable

Fuel: ................................. natural pure wood pellets (see section “

FUEL

”)

Heating:............................ forced ventilation

TEChNICAL DATA

model

PC-P03

Heat input

kW/h

6-11

Pellet consumption per hour

kg/h

0.6-2.2

Overall efficiency

%

≥90

Rated current during ignition

A

1.2

Maximum power input during ignition

W

248

Maximum power input at work

W

68

Electrical power supply voltage

V

230

Rated frequency

Hz

50

Fuel tank capacity

kg

21

Fuel size

mm

D6-8/L10-40

Exhaust outlet diameter

mm

Ø 76

Max heating area

110

Weight with cladding

kg

90

Packing sizes (HxWxD)

cm

985x520x550

N.B.: The above data may vary according to the characteristics of the pellets being used. (See section “FUEL”).

ACCESSORIES AND EQUIPMENT

Description

NTC 10K room temperature sensor

In kit

Flexible cable L = 4.9’ / (150 cm)

In kit

Door handle tool

In kit

Grate baffle plate

In kit

User’s manual

In kit

Remote control

In kit

Ash cleaning kit

optional

Maintenance tools kit

optional

En

gl

ish

Summary of Contents for PC-P03

Page 1: ...1 Pellet Stove PC P03 INSTRUCTIONS FOR INSTALLATION USEAND MAINTENANCE The instruction manual is an integral part of the product English ...

Page 2: ...oduct is to be installed is perfectly level When handling the steel parts of the cladding it is advisable to use clean cotton gloves to avoid leaving fingerprints that are difficult to removeatfirsttimeofcleaning The stove must be assembled by at least two persons Connectthepelletstovetotheelectricitysupplyonlyafterithasbeen connected by an expert to the flueway Theplugattheendofthepowercablemustb...

Page 3: ...ination requirements 12 Prevention of domestic fires 13 Mobile home installation 14 TECHNICAL CHARACTERISTICS AND SPECIFICATIONS 15 Features 15 Technical data 15 Accessories and equipment 15 Product identification data 16 Dimensional diagram 16 Wiring diagram 17 3 0 FUEL 18 4 0 PREPARING FOR INSTALLATION 18 USE 19 Loading the pellets 19 6 0 PRODUCT AND CONTROL SYSTEM 20 Product overview 20 Control...

Page 4: ...NECTION TO FLUE FLUEWAY SOOT INSPECTION APERTURE FRESH AIR INTAKE ELECTRIC POWER SUPPLY CAPACITY LOAD OF THE FLOOR MINIMUM SAFETY DISTANCES SOOT INSPECTION We recommend that the flue must have a chamber for collecting solid matter and any condensate located below the connection and which may be easily inspected by means of an airtight door Fig 1 English ...

Page 5: ...ning Use an elbow or shield to prevent prevailing winds from blowing directly into the outside air intake pipe NOTE Mesh screen should be no smaller than 1 4 by 1 4 6 4 by 6 4 mm Outside combustion air is required for all mobile home installations and where building codes require In bedroom or bathroom installations the outside air connection is required Contact local building authority before ins...

Page 6: ...ntofunitandbeyondeachsideof the fuel loading and ash removal opening 4 10cm from the external side of thecoating Connection to the flue must respect minimum safety distances from heat sensitive structural components or inflammable materials wood paneling beams or ceilings etc shown in figures The stove will become hot while in operation Keep children away from all stovesurfaces Direct contact with...

Page 7: ...not connect to a flueway into which extractor hoods discharge vapours The very hot exhaust gases may cause skin burns keep a considerable distance away from the appliance Theexhaustgasesfromthecombustionofpelletsfuelmaydirtytheoutsideofthewalls Toavoidsuchpossibilityterminatethevent above the roofline Pipes and maximum usable lengths Theexhaustpipeon allstoves is 3 76 mm O D so the stove wasdesign...

Page 8: ...ot whichbuildsupinsidethepipe Itmustalsopermitperiodiccleaningofthefluewithouttheneedto disassemble thepipes Single or double clean out tees may be used An example is given below of a flueway connection which allows complete cleaning without having to disassemble the pipes Fig 9 Fig 9 INSULATING MATERIAL SEE VENT MANUFACTURER S INSTRUCTIONS TEE DIRECTION OF CLEANING 0 10 TEE MIN 3 HMIN 13 H MIN5 D...

Page 9: ... as necessary to jog around joists or rafters Keep use of elbows to a minimum as they reduce draftscapacityofavent Continue theVent up through the roof line Slide the Flashing over the Vent until it sits on the roof line Slip the upper side of the Flashing base under the roof shingles Nail the flashing to the roof with a minimum of 8 roofing nails Seals the Flashing base with appropriate roofing m...

Page 10: ... areas require that a liner must be always installed to thetop of theflue asshown in figure even ifthe existing chimney is in compliance Fig 13 When chimneys are relined a chimney chase cap thatreduces the outlet of the chimney to the size of the liner is required Extend the exhaust vent above the chimney chase cap and finish it off with a raincap Asinglewalllinermayneedtobeinsulatedtomaintain ade...

Page 11: ...nthewallandvent awallbandmustbeinstalledjustabovetheteeandatleastevery6 ofventriseor iftherise isinferior attheendoftheverticalrun after a rise of at least 5 1 5 m installa 90 elbow aimedoutfrom the building wall attacha45 elbowto the90 elbow aimingthesecondelbowdown toward the ground Terminate the vent with a collar with screen fastenedtothe45 elbow theend ofthe ventpipe system must be atleasttwe...

Page 12: ...red Be sure to use approved pellet vent pipe and wall pass through fittings to go through combustible materials The type of installation must first be considered before determining the exact location of the venting termination in relation ship to doors window cavities or air vents See figures 18 19 Without outside combustion air connected to the unit For These types of installations please refer t...

Page 13: ...linstallation work iscarried out to professional standards PREVENTION OF DOMESTIC FIRES The product must be installed and used in compliance with the manufacturer s instructions and national standards as well as local regulations When a flue pipe passes through a wall or a ceiling special installation methods must be applied protection thermal insulation distances from heat sensitive materials etc...

Page 14: ...ous paragraphs PL Vent must be used for exhaust venting Single wall vent is not allowed Follow PL Vent manufacturer s installation directions and observe all listed clearances to combustibles Check any other local buildings codes or other codes that may apply WARNING DO NOT INSTALL IN A SLEEPING ROOM Combustion air must come from the outside of the mobile home Failure to do so may create negative ...

Page 15: ...DATA model PC P03 Heat input kW h 6 11 Pellet consumption per hour kg h 0 6 2 2 Overall efficiency 90 Rated current during ignition A 1 2 Maximum power input during ignition W 248 Maximum power input at work W 68 Electrical power supply voltage V 230 Rated frequency Hz 50 Fuel tank capacity kg 21 Fuel size mm D6 8 L10 40 Exhaust outlet diameter mm Ø 76 Max heating area m 110 Weight with cladding k...

Page 16: ...2018PC P03 03 16 DIMENSIONAL DIAGRAM Fig 22 Unit mm ...

Page 17: ...2018PC 03 03 17 WIRING DIAGRAM Fig 23 ...

Page 18: ...d be stored in a sheltered dry place To use good quality pellets with dimensions and heat producing properties other than those recommended above it will be necessary to change the stove operating parameters The useofcordwood is prohibited Do notburn garbage or flammable fluids such as gasoline naphtha or engine oil This customisation ofstovesettingsmustbecarriedoutby authorisedpersonnelbydistribu...

Page 19: ...any hot surfaces Operate this unit only with the fuel hopper lid closed Failure to do so may result in emission of products of combustion from the hopperunder certain conditions Maintain hopper sealingood condition LOADINGTHEPELLETS When lighting your stove for the first time or any time you have run out of Pellets you will need to fill the hopper Pellets are fed from the hoppertotheburnpotbyanaug...

Page 20: ...20 6 0 PRODUCT CONTROL SYSTEM Control panel Power switch back side Pellets hopper Hot air outlet Combustor doorknob Feeding hole Fire box Ash tray Ash cleaning rod 6 1 Product overview Fig 24 ...

Page 21: ...ing program click to on or off Setting temperature Click and press to set the temperature Room temperature Setting button click to enter the setting page Current fire level Quick timing press to set Minus and plus button for setting the temperature and quick timing 6 2 Controller Main page Fig 25 ...

Page 22: ...al mode Press for pellet feeding speed setting 3 is 100 speed 2 is 75 speed 1 is 50 speed 4 is 125 speed 5 is 150 speed Current time setting Week setting Timing program click to entering Factory model click and input the password to entering Number plate for setting the value Fig 26 6 3 Control system Setting ...

Page 23: ...ek then click save Auto boot time 24 hours per day Run time For example run two hours and three minutes then input 02 30 into the form Stage click to change four stages for one day the boot time should not be earlier than the Number plate for setting the time 6 4 Control system Timing Fig 27 ...

Page 24: ...value is 1 Fig 31 Fig 31 5 FEED1PR FEED4PR Setting the feeding period time for fire level 1 4 the default value is FEED1PR 5 FEED2PR 4 FEED3PR 3 FEED4PR 2 Fig 32 6 FAN1 FAN4 setting the hot air blower fan for fire level 1 4 the default value is FAN1 15 FAN2 20 FAN3 25 FAN4 35 Fig 32 Fig 32 20 Setting the auto ash cleaning time For example Auto clean the ash in every 4 hours Fig 33 Fig 33 21 Settin...

Page 25: ... replacing NTC room temperature sensor Fig 56 10K 2 Display shows E2 the flame sensor is missing or broken please replacing the K type flame sensor Fig 57 3 Display shows E3 the pellet hopper is empty please refuel 4 Display shows E4 the burning grate is not in the right place please replace it 5 Display shows E5 the pressure of burning chamber is not normal please close all the parts of this stov...

Page 26: ...ber and ash tray in a regular time If the ash tray is full the stove will stop to work Fig 36 Fig 36 2 Cleaning the ash from the heating tube in the regular time Fig 37 3 Opening the side plate and cleaning the inside ash in the regular time Fig 37 ...

Reviews: