Pilz PSEN ma1.3b-24 VA Operating Manual Download Page 11

PSEN ma1.3b-24 VA

Operating Manual PSEN ma1.3b-24 VA
22227-EN-03

| 11

– PNOZ e6vp, PNOZ e6.1p

}

PNOZpower for safety gate monitoring

– PNOZ p1p, PNOZ p1vp

}

PNOZsigma for safety gate monitoring:

– PNOZ s3
– PNOZ s4
– PNOZ s5

}

PNOZ X for safety gate monitoring

– PNOZ X2, PNOZ X2.5P, PNOZ X2.7P, PNOZ X2.8P, PNOZ X2.9P, PNOZ X2C
– PNOZ X3, PNOZ X3.1, PNOZ X3P, PNOZ X3.10P
– PNOZ X4
– PNOZ X5, PNOZ X5J
– PNOZ Ex

}

PNOZmulti for safety gate monitoring
Configure the switch in the PNOZmulti Configurator with switch type 3.

}

PSS for safety gate monitoring with standard function block SB064, SB066 or
FS_Safety Gate

}

PSSuniversal PLC for safety gate monitoring with function block FS_SafetyGate

The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Make sure that the connection is made in accordance
with the specifications in the operating manual for the selected evaluation device.

Defined properties of evaluation devices:

}

2-channel with feasibility monitoring

}

Open circuit monitoring of the safety switch is performed

}

Inputs and outputs on the evaluation device must fulfil the requirements of IEC 61131,
Type 3

}

Technical data of the evaluation device must fulfil the requirements in the 

Technical

details [

 17]

 of PSEN ma1.3b-24 VA

– Always comply with the max. switching current safety contacts of PSEN ma1.3b-24

VA.

}

Outputs at the evaluation device must only be switched on again when both reed con-
tacts at the safety switch have been opened and closed (partial operation lock)

INFORMATION
Risk time in accordance with DIN EN 60947-5-3

The risk time is made up of the reaction time of the sensor (see 

Technical

details [

 17]

) and the processing and delay times of the evaluation

device (s. operating manual for the relevant evaluation device).

Summary of Contents for PSEN ma1.3b-24 VA

Page 1: ...PSEN ma1 3b 24 VA Operating Manual 22227 EN 03 PSEN sensor technology...

Page 2: ...nta tion will be gratefully received Source code from third party manufacturers or open source software has been used for some components The relevant licence information is available on the Internet...

Page 3: ...personnel 6 Warranty and liability 6 Disposal 6 For your safety 7 Unit features 7 Function description 8 Block diagram 8 Operating distances 8 Lateral and vertical offset 9 Wiring 9 Pin assignment 10...

Page 4: ...is particularly important is identified as follows DANGER This warning must be heeded It warns of a hazardous situation that poses an immediate threat of serious injury and death and indicates preven...

Page 5: ...VA and the suitable evaluation devices see Requirements and connection to evaluation devices 10 The following is deemed improper use in particular Any component technical or electrical modification to...

Page 6: ...e of the art and the applicable national European and international laws directives and standards It is the company s responsibility only to employ personnel who Are familiar with the basic regulation...

Page 7: ...fety switch from the supply voltage WARNING Ignition spark from cable separator connector within the potentially explosive area can trigger an explosion When the cable separators connectors are used w...

Page 8: ...ith the following components Actuator PSEN ma1 3 08 EX VA see Order reference 19 and a connected evaluation device see Requirements and connection to evaluation devices 10 Block diagram 3 5 1 4 2 6 Ac...

Page 9: ...5 1 3 2 The stated values are valid at a temperature of 20 C Wiring Information given in the Technical details 17 must be followed Calculation of the max cable length lmax Rlmax Ri Rl km Imax Rlmax Ma...

Page 10: ...the safety switch s electrical connections from corrosion The safety contacts are not short circuit proof UL requirement the supply voltage must be provided via a Class 2 power supply Pin assignment T...

Page 11: ...ure that the connection is made in accordance with the specifications in the operating manual for the selected evaluation device Defined properties of evaluation devices 2 channel with feasibility mon...

Page 12: ...o an explosion Ensure that the supply voltages are referenced to a common 0 V ref erence potential PSENmag 2 3 5 4 6 1 Evaluation device Input circuit Input circuit Non Ex area Ex area 24 V 0 V Fig Du...

Page 13: ...24 V GND PSENmag 1 2 3 4 5 6 24 V PLC PSENmag Connecting the auxiliary contact to an eval uation device Connecting the auxiliary contact to a PLC Installation The unit can be installed in any positio...

Page 14: ...Avoid the risk of damages from foreseeable external influences by attaching the safety switch and actuator If necessary safety switch and actuator have to be protected INFORMATION Protect the actuator...

Page 15: ...also accessories must be connected to the equipotential bonding in case of a risk of charging Installation of safety switch Sensing face Slide the switch through the hole in the mounting surface with...

Page 16: ...tical offset see Operating distances and Lat eral and vertical offset 8 Periodic test Make sure that the work is not performed in an explosive atmosphere Carry out a monthly function test on the safet...

Page 17: ...urrent safety contacts 0 14 A Max breaking capacity safety contacts 2 6 W Max switching current auxiliary contacts 7 mA Utilisation category in accordance with EN 60947 1 DC 12 Max continuous current...

Page 18: ...d release distance Sar 18 mm Typical release distance Sr 13 mm Repetition accuracy switching distances 5 Min distance between safety switches 25 mm Sensor flush installation in accordance with EN 6094...

Page 19: ...b 24 PSEN ma1 3 08 EX VA 1U Magnetic safety switch actuator round with assured operating dis tance 8 mm Cable 10m 506 254 PSEN ma1 3b 24 EX VA 1switch Magnetic safety switch Cable 10 m 526 254 PSEN ma...

Page 20: ...fetyNET p THE SPIRIT OF SAFETY are registered and protected trademarks of Pilz GmbH Co KG in some countries We would point out that product features may vary from the details stated in this document d...

Reviews: