7. Screw the control element to the threaded ring again using 1,2 Nm (see figure) and ap-
ply the printed circuit board again.
a
Make sure that the strands are not damaged, crushed or twisted here.
8. Screw the printed circuit board to the fixing screws with 1,8 Nm (see figure).
9. Screw the fixing screws for the PIT gb terminating plate in again and tighten the screws
with 1,8 Nm.
a
Make sure that the strands are not damaged, crushed or twisted here.
[1]
Legend
[1] Terminating plate
10. Screw the PIT gb onto the mounting surface with the fixing screws with 4 Nm.
11. Connect the PIT gb to the evaluation device.
12. Perform a manual
function test [
15]
on the unit.
Only commission the plant that is controlled by the unit if the function test was success-
ful.
13. Recommission the plant that is controlled by the PIT gb.