PSEN ma2.1p-34
Operating Manual PSEN ma2.1p-34
22192-EN-07
| 11
Requirements and connection to evaluation devices
For use of PSEN ma2.1p-34 in accordance with DIN EN 60947-5-3 an evaluation device
must be connected.
Connect the PSEN ma2.1p-34
}
either
with a certified Pilz evaluation device
}
or
with an evaluation device with defined properties
Certified Pilz evaluation devices are, for example:
}
PNOZelog for safety gate monitoring
– PNOZ e3.1p, PNOZ e3vp
– PNOZ e5.13p
}
PNOZmulti for safety gate monitoring
Configure the switch in the PNOZmulti Configurator with switch type 3.
}
PSS for safety gate monitoring with standard function block SB064, SB066 or
FS_Safety Gate
}
PSSuniversal PLC for safety gate monitoring with function block FS_SafetyGate
The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Make sure that the connection is made in accordance
with the specifications in the operating manual for the selected evaluation device.
Defined properties of evaluation devices:
}
2-channel with feasibility monitoring
}
Open circuit monitoring of the safety switch is performed
}
Inputs and outputs on the evaluation device must fulfil the requirements of IEC 61131,
Type 3
}
Technical data of the evaluation device must fulfil the requirements in the
Technical
details [
17]
of PSEN ma2.1p-34
– Always comply with the max. switching current safety contacts of PSEN ma2.1p-34.
}
Outputs at the evaluation device must only be switched on again when both reed con-
tacts at the safety switch have been opened and closed (partial operation lock)
INFORMATION
Risk time in accordance with DIN EN 60947-5-3
The risk time is made up of the reaction time of the sensor (see
Technical
details [
17]
) and the processing and delay times of the evaluation
device (s. operating manual for the relevant evaluation device).