PN 350-007660-07
P a g e
|
7
5.
Screw an appropriate press tip (swivel, flat, or concave) for the sample type to be analyzed onto the
load cell assembly. A further description of the various press tips is detailed in the GladiATR manual
and in the Digital Force Adapter Usage section on page 8 of this manual.
6.
Using the provided plastic hooks, secure the cord from the load cell assembly along the horizontal
arm of the clamp. Place the load cell cord into the eye of the hook and snap the hook closed.
Remove the adhesive backing and press onto the horizontal arm portion of the clamp.
7.
Insert the connector of the load cell assembly and the power cord into the back of the LCD monitor.
The appropriate location of each connector is clearly labeled. If the load cell is not connected to the
LCD monitor prior to applying power, erroneous readings are displayed.
8.
Choose the appropriate electrical outlet adapter contained within the power cord kit, and attach it
to the power cord. Plug the power cord into the electrical outlet.
9.
Within the first 24 hours it is normal to experience drift. Therefore, 24 hours stabilization time prior
to use is recommended after initially connecting the LCD monitor into an electrical outlet. Due to
the long stabilization time, leaving the Digital Force Adapter assembly powered up is recommended.