25
De
utsch
English
7. Life phases
7.1 Lifting column scope of delivery ............................................................................... 38
7.2 Transport and storage ............................................................................................... 38
7.3 Important information on installation and putting into operation....................... 39
7.3.1 Load distribution ........................................................................................... 40
7.4 Fixing and assembly options on the lifting columns
(without accessory parts) ................................................................................................. 40
7.4.1 Assembly on the inner profile .......................................................................... 41
7.4.2 Assembly on the outer profile or the base plate............................................ 41
7.4.3 Assembly on the outer profile or the profile groove ..................................... 42
7.5 Connecting the controllers/hand switches ............................................................... 42
7.6 Operating the external controller ............................................................................ 42
7.7 Putting the lifting column into operation................................................................ 43
7.7.1 Putting the lifting column into operation with external controller .......... 43
7.8 Maintenance .............................................................................................................. 44
7.8.1 Maintenance of the lifting column .............................................................. 44
7.8.2 Maintenance of the hand switch / external controller ............................... 44
7.9 Cleaning...................................................................................................................... 45
7.10 Disposal and return.................................................................................................. 45