Interval
Maintenance work
Personnel
Before commissio-
ning/regularly
Assembly workstation with Multilift II ESD lifting column:
Check the effectiveness of the electrical connection in the
lifting column before commissioning and afterwards during
operation, regularly within the scope of ESD monitoring.
Assembly staff
Weekly
Check the assembly workstation for soiling. If necessary,
clean the assembly workstation with a clean cloth.
Note:
Do not use cleaning agents containing solvents!
Assembly staff
Monthly
Inspect the electrical connections of the lifting columns for
mechanical stress and to make sure they are firmly in place.
Qualified electrician
Check the assembly workstation (in particular the lifting col-
umns) for damage (visual inspection).
Assembly staff
Once a year
Carry out a safety inspection of the lifting columns as per
EN 62353.
Assembly staff
Check that the limit switches/end positions of the lifting col-
umns are fully functional.
Assembly staff
After 100,000 opera-
ting hours
Assembly workstation with Multilift II impact lifting
column:
Replace the lifting columns after 100,000 impact loads with
maximum impulse.
Assembly staff
As recommended by
the manufacturer.
Service the optional modules as per the corresponding
instructions.
Ä
Instructions for the optional modules
Assembly staff
Qualified electrician
Maintenance plan
Maintenance and troubleshooting
Maintenance plan
29.05.2019
Assembly workstation RK Easywork
94
Summary of Contents for RK Rose+Krieger Easywork
Page 55: ...Anhang Anhang 29 05 2019 Montagearbeitsplatz RK Easywork 55...
Page 56: ...Anhang 29 05 2019 Montagearbeitsplatz RK Easywork 56...
Page 58: ...Konformit tserkl rung 29 05 2019 Montagearbeitsplatz RK Easywork 58...
Page 110: ...Appendix Appendix 29 05 2019 Assembly workstation RK Easywork 110...
Page 112: ...Declaration of conformity 29 05 2019 Assembly workstation RK Easywork 112...